Similar Projects
Generator And Fire Suppression Project - 23-SCH-19 - Town of Smithfield
Renovation
Conception
$425,000 est. value
Smithfield, RI 02917

Window Replacement - 23-SCH-12 - Town of Smithfield
Renovation
Conception
$300,000 est. value
Smithfield, RI 02917

Rogers High School Replacement
New Construction
Design
Newport, RI 02840

Rogers High School Replacement Project - Construction Manager at Risk Team
New Construction - 160,000 SF
Post-Bid
$77,700,000 to $98,800,000 est. value
Newport, RI 02840

2021 Capital Improvements Project
Renovation
Post-Bid
North Kingstown, RI 02852

Design Services for Rogers High School Replacement Project
New Construction - 160,000 SF
Results
$77,700,000 to $98,800,000 est. value
Newport, RI

Charles E Shea High School
Renovation - 76,900 SF
Results
$37,500,000 est. value
Pawtucket, RI 02860

Construction of New School Administration Offices
Build-Out
Construction
Lincoln, RI 02865

Ferri Middle School Renovations
Renovation
Pending Verification
$39,000,000 est. value
Johnston, RI 02919

Johnston High School Renovations
Renovation
Pending Verification
Johnston, RI 02919

High School Media Center Renovation
Renovation
Post-Bid
Burrillville, RI

Renovation of Offices at Cumberland High School
Renovation
Results
Cumberland, RI 02864

Construction Manager At Risk
Renovation, Addition, Infrastructure - 84,171 SF
Post-Bid
$33,306,000 est. value
Providence, RI 02907

2021 Capital Improvements Project for North Kingstown School Department
Renovation
Results
North Kingstown, RI 02852

Portsmouth High School Ada Restroom Renovation
Renovation
Post-Bid
Portsmouth, RI 02871

Reported 06/30/2022 07:42 AM
Project Title

Abatement of And Replacement of Existing Flooring - 23-SCH-06 - Town of Smithfield

Physical Address View project details and contacts
City, State (County) Smithfield, RI 02828   (Providence County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $2,642,860
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of an educational facility in Smithfield, Rhode Island. Conceptual plans call for the renovation of a educational facility. The Jacobs Report and the architectural review done for the Stage-2 application to RIDE identified a number of deficiencies at SHS. In addition to those identified on other forms, this list of projects are necessary to maintain the safety, efficiency and The costs associated with this project are related to abating existing floors, prepare and install new VCT flooring. There are planned expenses as part of this project totaling $5,857,140, to be expended evenly between 2028 and 2032. This project is in included in the Town of Smithfield FY 2023-2027 Capital Improvement Plan (CIP). As of June 29, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents