Similar Projects
309 Resurface - Ben Titus Road North
Infrastructure
Conception
$5,506,573 CJ est. value
Tamaqua, PA 18252

309 Resurface - Ben Titus Road North
Infrastructure
Conception
$5,506,573 CJ est. value
Tamaqua, PA 18252

SR 1013 over Stony Brook
Demolition, New Construction, Infrastructure
Design
$495,000 CJ est. value
Zion Grove, PA 17985

SR 1013 over Stony Brook
Demolition, New Construction, Infrastructure
Design
$495,000 CJ est. value
Zion Grove, PA 17985

Capitol Parking Facility Rehabilitation - Phase I
Infrastructure
Bidding
$559,880 CJ est. value
Pottsville, PA 17901

Capitol Parking Facility Rehabilitation - Phase I
Infrastructure
Bidding
$559,880 CJ est. value
Pottsville, PA 17901

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Street/Road Resurfacing/Paving Wearing Course
Infrastructure
Post-Bid
Frackville, PA

Cold in Place Asphalt Recycling 2022 CIP Wild Cherry
Infrastructure
Results
PA

2022 Bituminous Paving
Infrastructure
Results
Frackville, PA

EMD Electronics Tungsten Hexafluoride Gas Manufacturing Plant Expansion
New Construction, Infrastructure - 45,000 SF
Pending Verification
$300,000,000 CJ est. value
Hometown, PA 18252

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

St.Clair to Frackville Reconstruction
Infrastructure
Design
$80,064,840 CJ est. value
Pottsville, PA 17901

2023 Multi-Municipal Bituminous Seal Coat
Infrastructure
Bidding
$400,000 CJ est. value
Pitman, PA 17964

Wayne Township Community Park
Infrastructure
Post-Bid
Friedensburg, PA

Last Updated 05/05/2023 11:38 AM
Project Title

I-81 - Pine Grove to Minersville Resurface

Physical Address View project details and contacts
City, State (County) Frackville, PA 17931   (Schuylkill County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $12,299,992 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This resurfacing project involves the following work, milling, asphalt overlay, concrete pavement patching, flexible base replacement, pavement markings upgrade, and other miscellaneous construction items, as indicated on the approved drawings included in the bid package for STATE ROUTE 81, SECTION 25M, in SCHUYLKILL COUNTY, PINE GROVE, TREMONT, FRAILEY, AND FOSTER TOWNSHIPS, from approximately SR 81 segment 0966 offset 0000 to segment 1120 offset 0100, SR 81 segment 0967 offset 0000 to segment 1101 offset 0100, SR 8005 segment 250 offset 0000 to segment 0250 offset 1273, SR 8005 segment 0500 offset 0000 to segment 0500 offset 0454, SR 8005 segment 0750 offset 0000 to segment 0750 offset 1464, SR 8005 segment 0760 offset 0000 to segment 0760 offset 1752. Project Cost Range: $12,500,000.00 - $14,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 0.00% Pre-Bid Meeting: None Prequalification Requirement: Yes Wage Rates: Yes State Type of Work: RESURFACING/OVERLAYS 408 Version: 2020-6 PennDOT - I-81 - Pine Grove to Minersville Resurface *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents