Similar Projects
Primary and Secondary Sustaining Project 1
New Construction
Bidding
$75,000,000 est. value
Lorton, VA 22079

Pump Station Communications Upgrade Project
Post-Bid
Portsmouth, VA

Holmes Run Pump Station Rehabilitation
Renovation
Post-Bid
Falls Church, VA 22044

Rady Park Pump Station Replacement
Results
Warrenton, VA

Construction of the Leachate Pump Station
Results
$2,586,790 est. value
Leesburg, VA 20175

Pump Station 23 Service Area Phase 8
Construction
Less than $4,500,000 est. value
Norfolk, VA

St. Paul's Pump Station #156
New Construction
Construction
$3,000,000 to $3,737,570 est. value
Norfolk, VA 23504

USDA-FS George Washington and Jefferson National Forest Bolar Mountain Waste Water Treatment Upgrade
Post-Bid
Hot Springs, Warm Springs, VA 24484

Kings Trail Pump Station 234 Replacement
Results
Less than $1,799,270 est. value
Virginia Beach, VA

BHTP Transmission Force Main Section 1 - Subaqueous Portion
New Construction
Post-Bid
Virginia Beach, VA

Expansion of the Centerville Chloramine Booster Station
Results
Richmond, VA

Nansemond Treatment Plant Advanced Nutrient Reduction Improvements Phase II(NP013820)
New Construction
Post-Bid
Suffolk, VA 23435

Construction of Lake Front Village Pump Station 309 Replacement
Results
Less than $951,938 est. value
Virginia Beach, VA 23456

Design-Build for Project Moss 3 Reclamation Project
New Construction
Post-Bid
Cleveland, VA

Occoquan Forest SPS 36 Replacement, Occoquan Forest SPS 37 Rehabilitation and Nokesville SPS and Force Main Replacement
Results
Manassas, Nokesville, VA 20112

Last Updated 06/01/2022 11:16 PM
Project Title

Griffith Finished Water Pumping Station Variable Frequency Drives and Soft Starters

Physical Address View project details and contacts
City, State (County) Fairfax, Lorton, VA 22079   (Fairfax County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install two 4,160 V1,800 hp VFDs, one 4,160 V-500 hp VFD, two 4,160 V-1800 hp Soft Starters and two 4,160 V500 hp Soft Starter at the Griffith Finished Water Pump Station; and to perform MCLU demolition and associated electrical work.

Details

Lift and Pump Stations, Renovation, Water Treatment Plant, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete, Miscellaneous Cast-in-Place Concrete, Grouting.
Division 05 - Metals.
Division 09 - Finishes, Painting.
Division 11 - Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents