Similar Projects
Arts Center Addition Facade and Soffit Repairs
Alteration
Bidding
$1,000,000 est. value
Milwaukee, WI 53211

2021 Westview Boulevard Concrete Curb, Pedestrian Path, Concrete/Asphalt Pavement Rehabilitation
Infrastructure
Bidding
Weston, WI 54476

Parking Lot Renovation
Post-Bid
Milwaukee, WI 53205

Remodeling and Repairs at 3936 N 25th Street
Renovation
Post-Bid
Milwaukee, WI 53206

Boardwalk Replacement
Results
De Forest, WI 53532

Motor Vehicles Storage Compound Expansion
Results
$700,000 est. value
Mosinee, WI 54455

Monona Terrace Exterior Caulking Replacement
Alteration
Bidding
Madison, WI 53703

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

Menomonee Park DEA Asphalt and Concrete Paving
Results
Menomonee Falls, WI 53051

Parking Lot Improvements Salmo Pond County Park
Infrastructure
Bidding
Black Earth, WI 53515

Burnham Pointe Park
Post-Bid
Less than $231,532 est. value
West Allis, WI

Gates of Heaven Exterior Restoration
Results
$400,000 est. value
Madison, WI 53704

Asphalt Parking Lot Sealcoat Projects
Infrastructure
Bidding
Stevens Point, WI 54481

Highway Salt Shed Roofing, Siding and Repairs
Post-Bid
Plover, WI 54467

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Reported 07/14/2021 12:00 AM
Project Title

South Stair Replacement, Fireman`S Park Pavilion

Physical Address View project details and contacts
City, State (County) Columbus, WI 53925   (Columbia County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Finishes/Exterior, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall field survey the South set of main entry stairs to note and measure existing conditions. Contractor shall prepare scaled drawings, plans and specifications for submittal to the City of Columbus Recreation and / or the Public Works Departments. Contractor shall be responsible to ensure drawings, plans and specifications meet all Federal, State and Local codes. Existing floating concrete footings shall be replaced with new permanent footings that meet code for the type and size of stair being replaced. Existing broken concrete sidewalk shall be replaced with new. Contractor responsible for demolition of old stairs, broken concrete sidewalk, and existing floating concrete footings and disposal of all related materials. All existing stair wood material shall be replaced with ground contact pressure treated lumber. Exterior rated hardware shall be used in all cases. State of WI Historical Society may require existing center handrails to remain. If so, existing pipe shall be removed of paint (chemical remover, sandblast, etc.). Pipe shall be coated with exterior rated primer and two finish coats of exterior based epoxy paint.

Details

Division 05 - Metals, Metal Stairs.
Division 06 - Wood, Plastics, and Composites, Wood Stairs and Railings.
Division 09 - Finishes.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents