Similar Projects
Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Pompey Pillar National Monument Rock Stabilization
Infrastructure
Design
$5,000,000 CJ est. value
Pompeys Pillar, MT 59064

Saint Charles Mission School Parking Lot Reconstruction and Drain Field Replacement
Infrastructure
Design
$570,000 CJ est. value
Billings, MT 59101

Mullowney Lane Improvements
Infrastructure
Bidding
$3,700,000 CJ est. value
Billings, MT 59101

Mullowney Lane Improvements
Infrastructure
Bidding
$3,700,000 CJ est. value
Billings, MT 59101

Lake Elmo C Fluminea Eradication
Infrastructure
Post-Bid
$494,506 est. value
Billings, MT 59105

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

Lake Elmo Dewatering Project
Infrastructure
Results
Billings, Helena, MT 59105

Hudson Bay Divide South
Infrastructure
Results

Shop World 3 Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Public Ramp - Northside Expansion - Phase 2 - City of Billings
Demolition, Infrastructure
Conception
$1,750,000 CJ est. value
Billings, MT 59105

Lead Service Replacements
Infrastructure
Design
$600,000 CJ est. value
Billings, MT 59101

Brewington Drive Reconstruction
Infrastructure
Bidding
$300,000 CJ est. value
Billings, MT 59105

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Last Updated 12/30/2022 06:01 PM
Project Title

Culvert Replacement - Schedule II; Moiling Drain at Barrett Road

Physical Address View project details and contacts
City, State (County) Billings, MT 59105   (Yellowstone County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of December 30, 2022, rejected all bids. No definite date for the rebid.** Rehabilitate approximately 190-LF of existing 72-Inch Diameter CSP culvert in the Holling Drain crossing Barrett Road just west of W. Echo Drive by lining with 63-Inch O.D. HDPE slip-line pipe. Miscellaneous work associated with this schedule includes bypass pumping of the Holling Drain, installing riprap and geotextile, and ditch and landscape restoration. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the "City of Billings, MT" in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Bids submitted via email shall have the bid bond scanned and included with the bid. Bids submitted via mail or hand delivered shall have any of the bid securities included. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER. The City of Billings is an Equal Opportunity Employer. For further information concerning this project, please contact JD Anderson at the Office of the City Engineer, 2224 Montana Ave, Billings, MT 59101, by telephone at (406) 237-6178 or by email at andersonj@billingsmt.gov. THIS BID SUBMITTED TO: City of Billings City of Billings City of Billings bids@billingsmt.gov or City of Billings P.O. Box 1178 Billings, MT 59103 or City of Billings 210 N 27 th Street Billings, MT 59101

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents