Similar Projects
Hudson River Water Reclamation Facility
New Construction
Bidding
GA

New Replacement Pumps at the Leachate Plant
Infrastructure
Bidding
Gainesville, GA

Naval Reserve Center Lift Station
Post-Bid
Columbus, GA

Lee Street Lift Station and Associated Improvements
Post-Bid
Valdosta, GA 31601

2016 Splost North Mainland Phase II Pump Station Improvements
Results
Brunswick, GA 31520

Mission Road Sewage Pump Station Replacement
Results
Less than $893,700 est. value
Cartersville, GA 30120

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

Main Street Pump Station Rehabilitation
Renovation
Bidding
Cartersville, GA

Bloomingdale Regional Utilities
New Construction
Post-Bid
Savannah, GA

Hampton Inn Lift Station
Results
Cornelia, GA 30531

Lift Station Project
New Construction
Post-Bid
Darien, GA

Pump Station 4059 Improvement
Results
Brunswick, GA 31520

Gainesville 85 Business Park Pump Station, Force Main and Gravity Sewer Project
Renovation
Post-Bid
Gainesville, GA

Construction of J.W. Smith Water Production Plant High Service Pump Station Upgrades
Results
Less than $2,746,374 est. value
Hampton, GA 30228

Savannah Quarters Lift Station and Force Main
New Construction, Infrastructure
Post-Bid
Pooler, GA

Reported 03/25/2022 12:00 AM
Project Title

Beck Road Lift Station & Force Main

Physical Address View project details and contacts
City, State (County) Commerce, GA   (Banks County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of the removal of two existing submersible pumps and replacement with new pumps at the Beck Road Lift Station, installation of new variable frequency drives (VFD’s), electrical improvements, and installation of new valves and miscellaneous piping. Work will also include removal and replacement of approximately 2500 LF of existing 10” sanitary sewer force main with new 12” DIP sanitary sewer force main (cross country). Additional work will include, but is not limited to, clearing & grubbing, removal & replacement of miscellaneous site items, and erosion and sediment control measures and devices.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents