Similar Projects
POL Tank Inspection
Term Contract
Bidding
Vienna, OH 44473

Fuel Station Maintenance UTC
Term Contract
Bidding
Columbus, OH

Mill Creek Metroparks Gasoline and Fuel Oil
Post-Bid
Canfield, OH

Chemical Inventory
Post-Bid
Bowling Green, OH 43402

Renovation of the Fields Avenue Facility (Underground Storage Tank Removal)
Results
Less than $203,254 est. value
Columbus, OH 43215

Underground/Aboveground Storage Tanks
Results
Less than $144,640 est. value
Westerville, OH 43081

Repair of Queensgate Fuel Piping and Pump Replacement
Infrastructure
Post-Bid
Cincinnati, OH 45214

North Plant Replace Caustic Tank
Results
Less than $383,650 est. value
Hamilton, OH 45011

Carbon Dioxide Tank Procurement Project
Results
Less than $215,000 est. value
Defiance, OH 43512

Total Phosphorus Treatment
Results
Less than $6,790,000 est. value
Dayton, OH

DOW/PAWP--Fluoride Tank Inspection, Repair or Replacement
Results
Columbus, OH

Shawnee State Park Marina AST System Installation
Results
Less than $352,000 est. value
West Portsmouth, OH 45663

Southerly Boiler UST SCP-015O
Results
Columbus, OH

DOW/PAWP-Fluoride Tank Inspection, Repair or Replacement
Results
Columbus, OH

West Branch Water Main Extension Bid Release #2 Site Utility Contractor
Results
Less than $105,000 est. value
Moraine, OH 45439

Last Updated 02/16/2022 02:46 PM
Project Title

2022 Miscellaneous Gas Main Replacement

Physical Address View project details and contacts
City, State (County) Hamilton, OH   (Butler County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the improvements on which proposals are requested will require the installation of a gas main, as described below: Base Bid 330 lineal feet of 2" polyethylene gas main directionally drilled, 1,320 lineal feet of 4" polyethylene gas main, 300 lineal feet of 4" polyethylene gas main to be inserted, 120 lineal feet of 8" polyethylene gas main, various gas services to be installed typically, with no valve, with roadway boxes and directionally drilled, inside steel gas piping to be installed by a licensed plumber and inspected by the City Building Department, all work and restoration on Pleasant Avenue and Hayes Avenue must be completed by April 1, 2022, and other miscellaneous items. Alternate 1 Bid 330 lineal feet of 2" polyethylene gas main directionally drilled, 180 lineal feet of 4" polyethylene gas main, 1,140 lineal feet of 4" polyethylene gas main directionally drilled, 300 lineal feet of 4" polyethylene gas main to be inserted, 120 lineal feet of 8" polyethylene gas main, various gas services to be installed typically, with no valve, with roadway boxes and directionally drilled, inside steel gas piping to be installed by a licensed plumber and inspected by the City Building Department, all work and restoration on Pleasant Avenue and Hayes Avenue must be completed by April 1, 2022, and other miscellaneous items.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents