Similar Projects
New Fire Station
New Construction
Conception
Orleans, MA

Menemsha Crossroads Firestation
New Construction, Renovation, Demolition - 10,761 SF
Design
Less than $11,100,000 est. value
Chilmark, MA 02535

Central Fire Station
New Construction
Design
Quincy, MA 02169

Phase 1 - Addition to West Plymouth Fire Station No. 2 - General Bids
Addition
Bidding
Plymouth, MA 02360

Construct a New Fire Headquarters and Renovate the Former Headquarters Building - General Bid
New Construction, Renovation - 24,200 SF
Bidding
$14,000,000 est. value
Milton, MA

Construct a New Fire Headquarters and Renovate the Former Headquarters Building - Sub Bid
New Construction, Renovation - 24,200 SF
Sub-Bidding
$14,000,000 est. value
Milton, MA

Quincy Public Safety Headquarters - Filed Sub Bids
New Construction
Sub-Bidding
$35,696,901 est. value
Quincy, MA 02169

Lower Basin Police Barracks Modernization - Filed Sub Bids
Post-Bid
$17,730,000 est. value
Boston, MA

Temporary Fire Station Space
Post-Bid
Greenfield, MA 01301

Maynard Fire Station - Filed Sub Bids
New Construction - 19,000 SF
Results
$11,000,000 est. value
Maynard, MA

Pinehurst Fire Station - Filed Sub Bids
New Construction
Results
$6,799,303 est. value
Billerica, MA 01821

Maynard Fire Station - General Bids
New Construction - 19,000 SF
Construction
$11,000,000 est. value
Maynard, MA

New Facility for the Carver Police Department - General Bids
New Construction - 12,000 SF
Construction
$5,200,000 to $7,500,000 est. value
Carver, MA 02330

New Fire Station Headquarters
New Construction
Design
Greenfield, MA

Exterior Restoration & Interior Renovations to the Gloucester Police Station/Gloucester District Courthouse
Renovation - 30,100 SF
Bidding
$9,800,000 est. value
Gloucester, MA 01930

Reported 12/10/2021 12:00 AM
Project Title

Quincy Public Safety Headquarters - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Quincy, MA 02169   (Norfolk County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes, but is not limited to, procurement and construction of a new City fueling depot, stormwater pump station, the retrofit of the existing 39 Broad Street building for tenant fit out, site electrical undergrounding and associated building electrical scope, and all materials, equipment, services, and construction inherent to the Work.

Details

Fire/Police Station, 129,600 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire-Extinguishing Systems, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents