Similar Projects
Replace Ice Bank Controls - Stocking Hall East
Renovation
Conception
Ithaca, NY 14853

Renovate Agricultural Science Building - Phase 1 At Alfred State College
Renovation - 56,210 SF
Conception
$30,000,000 to $35,000,000 est. value
Alfred, NY 14802

New Stem Building
New Construction
Design
$6,000,000 est. value
Troy, NY

Teaching and Learning Innovation Center and Asbestos Abatement
Renovation
Bidding
$1,000,000 to $4,000,000 est. value
NY 10468

SUNY Morrisville Galbreath Hall ADA & Classroom Renovation
Renovation - 86,843 SF
Bidding
$5,000,000 to $10,000,000 est. value
Morrisville, NY 13408

BSB Toilet & Locker Rooms at SUNY Downstate
Renovation
Sub-Bidding
$2,500,000 to $5,000,000 est. value
Brooklyn, NY 11203

Gertz Hall and HAZMAT Removal
Renovation, Alteration
Sub-Bidding
Queens, NY 11367

Dyson Center
Renovation, Addition - 107,437 SF
Post-Bid
$40,000,000 est. value
Poughkeepsie, NY 12601

Renovate Houghton Hall - Math Fitout at SUNY Fredonia
Renovation
Post-Bid
$2,500,000 to $5,000,000 est. value
Fredonia, NY 14063

Cleveland Hall Renovation
Renovation
Results
Less than $7,700,000 est. value
Binghamton, NY 13902

Renovate Hewitt Hall at SUNY Oswego - Phase 1
Renovation
Results
$20,000,000 to $25,000,000 est. value
Oswego, NY 13126

Construct New Emergency Services Building at SUNY Oneonta
New Construction - 9,000 SF
Construction
$5,000,000 to $10,000,000 est. value
Oneonta, NY 13820

Reconstruct Central Heating Plant at Buffalo State College
Construction
$10,000,000 to $15,000,000 est. value
Buffalo, NY 13903

97-12 65 Road Mixed Use
New Construction - 344,116 SF
Pending Verification
$10,000,000 CJ est. value
Queens, NY 11374

Replace Fire Alarms - Multiple Buildings - Geneva
Renovation
Conception
Geneva, NY 14456

Last Updated 02/08/2022 10:40 AM
Project Title

Hood Hall and Moffitt Hall Renovations, Associated Asbestos and Hazardous Material Abatement

Physical Address View project details and contacts
City, State (County) Plattsburgh, NY 12901   (Clinton County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,625,000 to $4,650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the renovation of existing student bathrooms in Hood Hall and associated Hazardous Material Removals, Plumbing, Fire Protection, Fire Alarm, HVAC, and Electrical work. Work in the bathrooms shall consist of complete demolition of all partitions, accessories, tile finishes, ceilings, plumbing fixtures, and serving utilities. Hazardous material abatement and removal shall include but is not limited to gypsum wall board, textured ceiling finishes, exterior foundation waterproofing, and pipe insulation. Student bathrooms will be reconfigured, and new partitions and finishes provided. New interior finishes shall include porcelain ceramic floor and wall tile wood doors, gypsum board ceilings, ACT ceilings, and toilet room accessories. Plumbing work will include replacement of all supply and sanitary risers with branch piping installed to new fixture layout. Mechanical work will include replacement of hot water heat risers located in the bathrooms, replacement of exhaust duct, fans, installation of split system AC, laundry make-up air system, and modifications to the building BMS system. New lighting and power will be provided based on layout. Fire Alarm devices and Fire Protection sprinkler heads will be relocated as required by new plan. One elevator will be renovated at the end of construction. Additional work at Hood Hall includes reconfiguring existing toilet rooms, offices, Resident Director’s Apartment, and laundry rooms. In addition to new partitions, finishes and casework, mechanical, plumbing, fire protections, BMS, fire alarm and electrical systems will be modified to address new work. Moffitt Hall work is limited to the creation of a laundry room within the Resident Director Apartment and installation of a split unit AC system. Sitework is limited to Hood Hall and includes restoration of the site upon construction of new areaway and the installation of a new concrete pad and bike storage shelter.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Asbestos Remediation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents