Similar Projects
Wind Farm off Virginia Coast
New Construction
Conception
$7,800,000 est. value
Richmond, VA

Edelen Renewables Solar Farm
New Construction
Conception
Hurley, VA

Midway Solar Project
New Construction
Design
Batesville, VA 22920

Midway Solar Project
New Construction
Design
Batesville, VA 22920

Combined Heat And Power Plant - Structural Steel and Finishes Package - NNSY ESPC - Foundation Package
Renovation
Post-Bid
Portsmouth, VA 23709

South Rivanna Hydropower Plant Decommissioning
Renovation, Demolition
Post-Bid
Charlottesville, VA

Construction of Energetic Waste Incinerator and Contaminated Waste Processor (EWI/CWP)
New Construction
Results
$100,000,000 to $250,000,000 est. value
Radford, VA 24141

5 Mw Solar Facility
New Construction
Pending Verification
Clover, VA

Halifax Road Solar
New Construction
Pending Verification
Dinwiddie, VA

South Boston Solar
New Construction
Conception
South Boston, VA 24592

Chesapeake Solar Energy Facility
New Construction
Design
Chesapeake, VA 23325

Borrego Centerville Solar Field
New Construction
Pending Verification
Chesapeake, VA 23322

Borrego Solar Systems
New Construction
Conception
Dinwiddie, VA

Solar Plant
New Construction
Design
Gloucester, VA

Dominion solar Facility
New Construction
Pending Verification
Clover, VA 24534

Reported 12/01/2021 09:17 AM
Project Title

Sun Tribe Solar

Physical Address View project details and contacts
City, State (County) Fork Union, VA 23055   (Fluvanna County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Bids by Invitation.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

35 Acres, Power Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents