Similar Projects
Canine Companions Early Development Center & Clinic
New Construction, Addition - 27,171 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Santa Rosa, CA 95407

Aerin Medical
Renovation - 15,009 SF
Conception
Mountain View, CA 94043

Scripps Mercy Medical Office Building Encinitas
New Construction - 68,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Encinitas, CA 92024

Scripps MD Anderson Outpatient Cancer Center La Jolla
New Construction
Design
San Diego, CA 92104

Construction of Tenant Improvements - Sonora Womens Clinic
Renovation - 2,054 SF
Bidding
$200,000 CJ est. value
Sonora, CA 95370

4N Cardiology Cath Lab II
Renovation - 3,550 SF
Bidding
$5,000,000 CJ est. value
San Diego, CA 92161

COVID-19 Environmental Cleaning Services
Term Contract
Sub-Bidding
Springville, CA 93265

COVID-19 Environmental Cleaning Services
Term Contract
Sub-Bidding
Vacaville, CA 95688

Octapharma Plasma, Inc.
Renovation - 8,411 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
San Diego, CA 92115

Tenant Improvements and Alterations to an Existing Building
Renovation
Post-Bid
Salinas, CA 93901

Construction Management Services
New Construction
Results
$75,000,000 est. value
Martinez, CA 94553

Foothill High School - Site Improvements for One (1) Modular Nurse's Building
Renovation - 960 SF
Results
$340,000 est. value
Bakersfield, CA 93314

Ohana Adolescent Behavioral Health Center
New Construction - 55,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Monterey, CA 93940

UC Davis Health Hospital
New Construction, Demolition - 1,000,000 SF
Construction
$3,750,000,000 est. value
Sacramento, CA 95817

Eldercare Facility
New Construction - 133,000 SF
Pending Verification
$10,000,000 CJ est. value
Los Angeles, Northridge, CA 91326

Last Updated 08/10/2022 11:06 AM
Project Title

1930 Market Street Leasehold Seismic Retrofit

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94102   (San Francisco County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project is a seismic retrofit in an existing 1950s wood framed building - 1930 Market Street, San Francisco. There will be some associated selective demolition of ceilings and patching of existing finishes. The construction triggers some minor accessibility upgrades in the restrooms, entrances and parking. The University reserves the right to reject any or all responses to Prequalification Questionnaires and to waive non-material irregularities in any response received.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents