Similar Projects
HVAC Replacement at Collington Square Pre-K to 8 School 097
Bidding
Baltimore, MD 21213

Waldorf Senior and Recreation Center Acoustical Panels
- 3,000 SF
Bidding
La Plata, Waldorf, MD 20602

Jessup Maintenance Facility Building Restoration
Renovation
Post-Bid
Less than $50,000 est. value
Jessup, MD 20794

Protective Coating Of Water And Wastewater Assets
Term Contract
Post-Bid

Repair or Replace SSA Headquarters Failed or Missi
Results
Baltimore, MD 21235

Repair or Replace SSA Headquarters Failed or Missi
Results
Baltimore, MD 21235

On-Call Insulation Services
Post-Bid
College Park, MD 20742

On-Call Insulation Services
Term Contract
Results
Towson, MD 21252

Maintenance Services of Residence Halls on UMES Campus
Post-Bid
Princess Anne, MD 21853

Dynard Elementary School Media Center Reading Steps Removal
Results
Less than $49,999 est. value
Chaptico, MD 20621

Repair Fire Suppression, HVAC, Mold Building 1915
Post-Bid
$1,000,000 to $5,000,000 est. value
Andrews Air Force Base, MD 20762

Sound Proofing for Studio
Term Contract
Results
Annapolis, MD 21401

Installation of Blackout Roller Shades at Mechanicsville Elementary
Post-Bid
Mechanicsville, MD 20659

Insulation Installation, Removal, Replacement and Related Services
Results
Towson, MD 21204

Gardener`s Cottage Chimney Repair
Post-Bid
Saint Leonard, MD 20685

Reported 06/27/2020 12:00 AM
Project Title

New Council Dais

Physical Address View project details and contacts
City, State (County) Takoma Park, MD 20912   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed contract for the new council dais is expected to contain the following: Area for 11 people. Bulletproofed Level III Body Armor. Divided in sections that can be assembled before meetings and wheeled on and off stage, and entered through back stage double door. (P-11, P-13) Stations for monitors at such a level that they allow councilmembers to see the screens and to communicate with the audience without being covered. (P-9) Dais position in stage must be close to utility box on stage floor, but leave it available for cable connection. (P-15) Dais' segments must have openings or conduits for cable connection. (P-10, P-12) Transportation of dais to Takoma Park. Assemblage of dais modules at Community Center Auditorium Stage.

Details

Division 09 - Finishes.
Division 10 - Specialties, Wall and Door Protection, Bullet Resistant Panels.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents