Similar Projects
First Street Slope Stabilization Project
Demolition, Alteration
Bidding
$309,235,613 est. value
Santa Ana, CA

Water Pollution Control Plant Dirt Relocation
Infrastructure
Bidding
$3,000,000 to $4,000,000 est. value
San Leandro, CA 94577

The Haskell Stewardship Integrated Resource Timber Contract (IRTC)
Infrastructure
Post-Bid
Quincy, CA

S205--Bridge - Solid Waste Collection Disposal
Term Contract
Post-Bid
Rancho Cordova, Sacramento, CA 95655

Unitized Group Rations (Ugrs) Food Waste Disposal Service At Dla Distribution San Joaquin, Ca
Term Contract
Results
Tracy, CA 95304

Road Materials and Hauling Services
Infrastructure
Results
Fairfield, CA

Sludge Hauling, Treatment, and Disposal
Term Contract
Bidding
Edwards Air Force Base, CA - Bristol, Chipley, Crestview, Defuniak Springs, Malone, Monticello, Wewahitchka, FL 32465

On-Call Pickup, Removal, Clean Up, and Disposal Services Of Hazardous Waste, Environmentally Regulated Waste, and Lab Packed Waste
Infrastructure
Post-Bid

Solid Waste Services Procurement Assistance
Infrastructure
Results
San Clemente, CA 92672

Non-Hazardous Dry Garbage, Construction Debris Collection, Removal and Disposal Services
Term Contract
Bidding
San Diego, CA 92179

S2--Option - Waste Removal
Term Contract
Post-Bid
San Diego, CA 92101

Neighborhood Cleanup On Call Services
Infrastructure
Results
Sacramento, CA

Trash Collection, Hauling, and Disposal Services
Infrastructure
Bidding

Trash and Street Sweeper Debris Disposal
Infrastructure
Post-Bid
Auburn, CA 95603

Bedford Wash Debris Removal and Disposal Phase Two
Infrastructure, Alteration
Results
Corona, CA 92882

Last Updated 04/04/2022 10:30 AM
Project Title

Removal of LCAC Rubberized Trash Material

Physical Address View project details and contacts
City, State (County) Camp Pendleton, CA   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

: LCAC rubber trash removal required at ACU-5 in Marine Corps Base, Camp Pendleton (MCB) CA. Contractor shall stage two metal bins at the backside of ACU-5 flight line. Bins minimum size (length/width/height) is 14’ x 7’ x 5’ with load weight capacity of 6,000 LBS. Trash bins will be utilized to prevent foreign object damage (FOD) to Landing Craft Air Cushion (LCAC) crafts and to maintain cleanliness throughout the LCAC flight line. ACU5 S-1 Division will notify the contractor when bins are full and ready for pickup. Pick-up/payment schedule of LCAC rubber trash removal will be as on NEEDED BASIS ONLY. ACU-5 will request to recoup unused funds via FDM prior to end of fiscal year.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents