Similar Projects
Last Updated | 04/04/2022 10:30 AM |
Project Title | Removal of LCAC Rubberized Trash Material |
Physical Address | View project details and contacts |
City, State (County) | Camp Pendleton, CA (San Diego County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | : LCAC rubber trash removal required at ACU-5 in Marine Corps Base, Camp Pendleton (MCB) CA. Contractor shall stage two metal bins at the backside of ACU-5 flight line. Bins minimum size (length/width/height) is 14’ x 7’ x 5’ with load weight capacity of 6,000 LBS. Trash bins will be utilized to prevent foreign object damage (FOD) to Landing Craft Air Cushion (LCAC) crafts and to maintain cleanliness throughout the LCAC flight line. ACU5 S-1 Division will notify the contractor when bins are full and ready for pickup. Pick-up/payment schedule of LCAC rubber trash removal will be as on NEEDED BASIS ONLY. ACU-5 will request to recoup unused funds via FDM prior to end of fiscal year. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |