Similar Projects
Signaw River Dredging
Infrastructure
Design
$500,000 CJ est. value
Morton, IL 61733

Stadium and North Parking Lot Drainage Improvements Project
Infrastructure
Post-Bid
$275,000 CJ est. value
Pekin, IL 61554

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Lincoln ES & SHS Site Improvements
Infrastructure
Results
Morton, IL 61550

Installation of New Traffic Signals, Pavement Markings, ADA Ramp, Curb and Gutter, Riprap, Median Reconstruction
Infrastructure
Results
$649,720 CJ est. value
Pekin, IL 61554

Panda Express / Pekin
New Construction, Infrastructure - 2,229 SF
Post-Bid
$680,000 CJ est. value
Pekin, IL 61554

Renovate Courtyard and ADA Improvements Illinois Central College
Infrastructure, Renovation
Results
$3,693,262 CJ est. value
East Peoria, IL 61611

Vehicle Maintenance and Storage Building
Renovation
Post-Bid
$90,000 est. value
Washington, IL

Agriculture Storage Building for Illinois Central College
New Construction, Infrastructure
Results
$2,297,000 CJ est. value
East Peoria, IL 61635

Water System Improvements
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Groveland, IL 61535

Furnish and Applied - Bituminous Materials
Infrastructure
Results
$885,628 CJ est. value
Morton, IL 61733

Construction of the Erie Court Watermain Extension Project
Infrastructure
Post-Bid
$455,000 CJ est. value
Morton, IL 61550

Construction of 2023 Main Street Reconstruction
Infrastructure
Results
$94,705 CJ est. value
Deer Creek, IL 61733

Illinois Central College Campus Pavement Replacement Phase IV Life Safety Improvements
Infrastructure
Post-Bid
$700,000 CJ est. value
East Peoria, IL 61611

Centerline Joint Repair on IL 8/US 150
Infrastructure
Results
$355,408 CJ est. value
East Peoria, IL 61611

Last Updated 10/04/2023 09:38 AM
Project Title

Renovate and Construct a New Wash Area

Physical Address View project details and contacts
City, State (County) Morton, IL 61550   (Tazewell County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Car Wash, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: Morton Maintenance Truck Storage and Wash Bay (IDOT308-0007) encloses approximately 2,500 square feet of space between truck storage and wash bay buildings and constructing a 2-bay wash area, converting 5 bays into 4 bays, upgrading heating, ventilating, and electrical systems. Morton Maintenance Repair/Service Building (D0413) extends 3 bays by 15 feet, upgrading heating, ventilating, electrical systems, and lighting. Morton Maintenance Material Storage (IDOT 308-006 & D0449) encloses approximately 1,300 square feet of space between the existing material storage buildings, including electrical and lighting. Using Agency's winter season is from November 1 through March 30th. Contractor is to coordinate scheduling with the Using Agency to avoid impacting the operation of the site. BID SECURITY: Bid security must be submitted with each bid equal to 10% of the base bid and must be in the form of a CDB bid bond, certified check, cashier's check or bank draft. For additional assistance related to the e-Builder system, email CDB@OnIndus.com. Questions submitted through the e-Builder module will not reviewed or responded to. CDB's Rights. When, in its opinion, it isin the best interest of the State, CDB reserves the right to: A. Accept any bid B. Reject any or all bids C. Waive technical deficiencies and irregularities D. Allow bidder to remedy technical deficiencies or irregularities within a stated time E. Rescind any notice of award if CDB determines the notice of award was issued in error F. Rescind any notice of award when it is in the best interest of the State G. Rebid any contract

Details

,, 9,000 SF - 1,500 SF. 1,500 SF. 1,500 SF. 1,500 SF. 1,500 SF. 1,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents