Similar Projects
Entitled HVAC Filter Service
Alteration
Bidding
Fayetteville, NC 28306

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Furnish and Deliver Trenton Products Walk-In Cooler and Freezer Systems
Results
Less than $14,397 est. value
Bonnie Doone, NC 28303

Anne Chesnutt Middle School and Morganton Road Elementary School, HVAC Infrastructure
Results
Fayetteville, NC 28303

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Morganton Road Elementary School, Kitchen HVAC Addition and Building F HVAC Unit Replacement
Results
Fayetteville, NC 28303

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Benjamin Martin Elementary School and Ponderosa Elementary School Kitchen HVAC Additions
Results
Fayetteville, NC 28303

Phase 2 Classroom HVAC Upgrade at South View Middle School
Post-Bid
Less than $500,000 est. value
Hope Mills, NC 28348

Seventy-First High School, Kitchen HVAC Addition
Results
Fayetteville, NC 28304

Phase 1 HVAC Replacement Ramsey Street High School
Post-Bid
Fayetteville, NC 28301

South View High School Admin A/C Replacement
Results
Hope Mills, NC 28348

Garage Air System Repair
Alteration
Post-Bid
Fayetteville, NC

C Wayne Collier Cafeteria A/C Replacement
Results
Fayetteville, NC 28305

Last Updated 09/22/2021 09:30 AM
Project Title

Pine Forest Middle School Building 2 HVAC Replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28311   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pine Forest Middle School Building 2 HVAC Replacement. This Project includes: Replacement of existing window ac units in classrooms and kitchen with packaged terminal heat pump units. Some windows will have to be temporarily modified to allow new packaged terminal heat pumps units to be installed. Add electric wall heaters in restrooms. Upgrade two electrical panels and provide new electrical power to new packaged terminal heat pump units and wall heaters.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents