Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Water Source Heat Pumps; BP#1-23C Ground Source DOAS Units
Alteration
Post-Bid
Kenilworth, IL

HVAC Parts and Supplies
Alteration
Post-Bid
Chicago, IL

Des Plaines HVAC Improvements
Results
Des Plaines, IL

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

Pre-Purchase of A Chiller
Alteration
Post-Bid
Palatine, IL

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

HVAC Service Contract
Alteration
Post-Bid
Oak Park, IL 60304

Replace Split System Condensing Unit at Pace Northwest Division
Results
Arlington Heights, IL

2022 Four Schools (Chiller Pre-Purchase)
Alteration
Post-Bid
Mount Prospect, IL 60056

J041--Repairs need to HVAC System(578)
Term Contract
Results
Hines, IL

2022 Summer Work - Bid Period 002 - Mechanical Equipment
Alteration
Post-Bid
Winnetka, IL

2021 Pool RTU Replacement
Alteration
Results
Streamwood, IL 60107

HVAC Equipment Pre-Purchase
Alteration
Post-Bid
IL

Last Updated 03/20/2023 11:38 AM
Project Title

Chiller Replacement Skokie Public Library

Physical Address View project details and contacts
City, State (County) Skokie, IL 60077   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $736,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Chiller Replacement Skokie Public Library TYPE OF BID REQUESTED Bids for performing the Work shall be on a lump sum basis. Owner reserves the right to retain 10% on payments to Contractor until Final Acceptance of Work. Base Bid and Alternates shall include all Work called for in the Project Manual, on the Drawings and in any Addenda that may be issued. Prices for Work performed by all subcontractors (including a General Contractor, if used) shall be included in Base Bid and Alternates. Owner reserves the right to request a copy of any subcontractor's proposal. All copies of Project Manual, Drawings and Addenda shall be returned with Bids. Successful Bidder shall receive copies of bidding documents back after signing contract for the Work. Technical questions should be directed to the Engineer: Grumman|Butkus Associates 820 Davis Street, Suite 300 Evanston, IL 60201 Attention: Steve Zehr Project Manager 847.328.3555 x260 szehr@grummanbutkus.com Questions shall be submitted in writing. Answers will be provided in writing, with the original questions, to all bidders. TIME: All Proposals shall be time-stamped as received. Any Proposal received after time due may be returned unopened at Owner's discretion. TYPE OF BID OPENING: Public 9. RIGHT TO REJECT BIDS Owner reserves the right to reject any or all bids, to award all or part of a bid to any vendor, to accept an alternate, or to award the contract to other than the lowest bidder, and to waive any nonconformity, informality or irregularity in any bid at its sole discretion. BID SECURITY 10.1 No Bid Security will be required. CONTRACT SECURITY (PERFORMANCE BOND AND LABOR AND MATERIAL BOND) Performance bond and Labor and Material Bond will be required for this project. Refer to the Instructions to Bidders for requirements. CONTRACT FORM 12.1 A copy of the Contract Form is included in the Project Manual. PREVAILING WAGE NOTICE 13.1 The contractor shall comply with the Illinois Prevailing Wage Act. Refer to the Instructions to Bidders for requirements. SUBSTANCE ABUSE PREVENTION ACT 14.1 The Contractor shall comply and cause all subcontractors to comply with requirements and provisions of the Illinois Substance Abuse Prevention on Public Works Projects Act. Refer to the Instructions to Bidders for requirements. COMPLIANCE WITH ALL LAWS NOTICE 15.1 Contractor shall comply with all applicable laws, regulations, and rules promulgated by any Federal, State, County, Municipal and or other governmental unit or regulatory body now in effect during the performance of the work, and the orders and decrees of any courts or administrative bodies or tribunals in any manner affecting the performance of the Contract for this project. By way of example, the following are included within the scope of the laws, regulations and rules referred to in this paragraph, but in no way operate as a limitation on the laws, regulations and rules with which Contractor must comply: all forms of Workers Compensation Laws, all terms of the Equal Employment Opportunity Clause of the Illinois Fair Employment Practices Commission, the Illinois Preference Act, Illinois Substance Abuse Prevention on Works Projects Act, the Social Security Act, Statutes relating to contracts let by units of government, all applicable Civil Rights and Anti-Discrimination Laws and Regulations, and traffic and public utility regulations. Question Deadline 02/17/2023 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents