Similar Projects
Fox College Parking Lot & Detention Addition
Conception
Tinley Park, IL

Country Club Expansion
Renovation
Conception
Glenview, IL 60025

Site Reconstruction
Bidding
Streamwood, IL 60107

Chicago Department of Transportation Job Order Contract for Flatwork - Site Work
Bidding
Chicago, IL

748842: DWM Job Order Contract Civil - Site Work Disciplines
Term Contract
Post-Bid
Chicago, IL

Sandblasting, Crack Repair and Painting
Post-Bid
Niles, IL 60714

Site Improvements
Renovation
Results
$146,000 est. value
Des Plaines, IL 60016

2020 Capital Improvements
Results
$1,000,000 est. value
Buffalo Grove, IL 60089

Renewable Energy & Urban Farming Campus
New Construction - 13,000 SF
Construction
$36,000,000 est. value
Chicago, IL 60661

Cardinal Drive Park Inclusive Playground
Bidding
Rolling Meadows, IL

Chestnut Avenue Improvements
Post-Bid
Glenview, IL 60026

Sitework Improvements to Gordon School
Results
Posen, IL 60469

CPS Lincoln Park/Payton Science Labs
Renovation
Bidding
Chicago, IL 60614

AIDS Garden Lincoln Park
Post-Bid
Chicago, IL 60657

Fox Run Golf Links Sitework and Improvements
Demolition
Results
Elk Grove Village, IL 60007

Last Updated 07/24/2020 09:07 AM
Project Title

Duke Park AKA Old Green Bay Trail Playground Site Improvements

Physical Address View project details and contacts
City, State (County) Glencoe, IL 60022   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of tree preservation, removal of existing trees, shrubs and perennials, existing play equipment & footings, playground mulch surfacing & base, concrete barrier curb, concrete pavement and pad, site amenities, such as swing bench, backed benches and trash receptacles as indicated on the drawings. Installation of erosion control measures, site excavation and grading, construction and installation of new playground play equipment, poured in place rubber surface, concrete walk, concrete walk with thickened edge adjacent to playground, concrete barrier curb around playground; interactive water fountains such as water jets, and associated water system components such as water supply pipes control panel, water drain; precast concrete water runnel and hand pump; play trains and steel train track on concrete pavement; site amenities such as backed benches, backless benches, picnic tables, bike racks, and drinking fountain; utilities and drainage; existing flag pole lighting improvement; landscaping, such as trees, shrubs, perennials & ornamental grasses, and sod & seed restoration; Installation of social spaces site amenities such as benches and seating as an ALTERNATE #1 and Veterans` Memorial plaza site amenities such as precast concrete benches and concrete pavement as an ALTERNATE #2. The selected contractor is required to obtain all necessary permits prior to mobilization with the Village of Glencoe.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents