Similar Projects
Rock Island Greenway-hillcrest Connect
Infrastructure
Design
$500,000 CJ est. value
Dubach, LA 71235

Rock Island Greenway-hillcrest Connect
Infrastructure
Design
$500,000 CJ est. value
Dubach, LA 71235

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

Tanyard Creek Subdivision Phase II & III
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Ruston, LA 71270

Buc-ee's / Ruston
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Ruston, LA 71270

LA 146 Bridges Near Kelleys
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Ruston, LA 71270

Lift Stations Backflow Preventative Maintenance Service
Renovation, Infrastructure
Post-Bid
Reserve, LA

2022 District 7, 9 Road Improvements
Infrastructure
Results
$1,797,697 est. value

US 80: Lt Turn Ln at Nutmeg, LA 818 N and S
Infrastructure
Design
$2,500,000 CJ est. value
Ruston, LA 71270

Water Production System Improvements, Water Well No. 6; Delta Regional Authority
Renovation, Infrastructure
Post-Bid
$921,816 CJ est. value
Simsboro, LA 71275

Wesley Chapel Water System Merger With Mt. Calm Water System
Infrastructure
Results
$1,273,878 CJ est. value
Ruston, LA 71270

Murphy Oil #5687/7857 / Ruston
Demolition, New Construction, Infrastructure - 2,800 SF
Design
$1,500,000 CJ est. value
Ruston, LA 71270

Last Updated 03/08/2023 06:02 AM
Project Title

LA 823 : Drainage Improvements

Physical Address View project details and contacts
City, State (County) Dubach, LA 71235   (Lincoln County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Type Improvement Asphalt Lifts to Raise Roadway & Re-establish Exist. Ditches Length 0.13 miles Parish : Lincoln Estimated Cost Range $250,000 to $500,000 As of March 01, 2023, the project is in Design status. Anticipated letting date is November 08, 2023. LADOT - LA 823 : Drainage Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents