Similar Projects
Heating Energy Assistance Retrofit Task Weatherization Assistance Program (HEARTWAP)
Term Contract
Design
Springfield, MA 01103

Natural Gas Welding Services Annual Contract
Term Contract
Sub-Bidding
Holyoke, MA 01040

Purchase Agreement for Phosphoric Acid as Corrosion Inhibitor in Portable Water Systems
Term Contract
Sub-Bidding
Agawam, MA 01001

Pest Management Service
Term Contract
Post-Bid

2022 Excavations and Restorations Annual Contract Rebid
Term Contract
Post-Bid
Holyoke, MA 01040

Pavement Preservation Project/Various Locations
Term Contract
Results
$550,000 CJ est. value
Arlington, MA 02476

Tree and Forestry Services
Term Contract
Results
Chicopee, MA 01013

Gas Pipe Fitter Services
Term Contract
Sub-Bidding
Westfield, MA 01085

Exterior Cleaning of Royal Street Elevated Potable Water Tank
Alteration
Post-Bid
$13,000 est. value
Chicopee, MA 01020

Action Energy Services Weatherization Assistance Program
Alteration
Post-Bid

Pest Control Services
Term Contract
Post-Bid
Holyoke, MA

RFP for Accounting Services
Term Contract
Post-Bid

On-Call Sprinkler Maintenance, Inspection, and Repairs
Term Contract
Post-Bid
$250,000 CJ est. value
Springfield, MA 01103

Bitiminous Concrete as Needed for Chicopee Highway Department
Term Contract
Post-Bid
$20,000 CJ est. value
Chicopee, MA 01013

Repair and Maintenance of Automated Logic Equipment
Term Contract
Post-Bid
Springfield, MA 01103

Last Updated 02/24/2023 02:12 PM
Project Title

Prime Contractor for Maintenance Dredging of Franconia Golf Course

Physical Address View project details and contacts
City, State (County) Springfield, MA 01108   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Maintenance Dredging of Franconia Golf Course's Irrigation Pond will include dredging, removal, and transportation of approximately 1,400 C.Y +- of sediment. The contractor will be responsible for all temporary construction mats, turbidity curtains, erosion control efforts, and other environmental protections referenced in the plans required to dredge in the water of the irrigation pond. The material excavated from the pond will be transported to the sediment reuse area shown on the project plans, the contractor will be responsible to repair any damage from the transportation of material to the satisfaction of the owner. The purpose of this project is to allow the City of Springfield to utilize the irrigation pond to water Franconia Golf Course. This IFB is subject to M.G.L. Ch. 30 39M and other state procurement statutes. MA Prevailing Wages will apply to this project. This project has an estimated cost of two hundred and ten thousand dollars ($210,000.00). Questions must be submitted in writing to Hope Button, Deputy Procurement Officer, City of Springfield, MA, Office of Procurement 36 Court St., Room 307, Springfield MA 01103 hbutton@springfieldcityhall.com by 4:00 PM on February 15th, 2023 in order to be considered. The City reserves the right to waive any informality in, or to revoke, any or all bids, if in the public interest to do so. The Deputy Procurement Officer reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so. The City of Springfield supports the goal of twenty percent minority and women (MWBE) participation in all contracts

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents