Similar Projects
Replace Side Wall Metal on a Building
Renovation
Design
$100,000 CJ est. value
Staunton, IL 62088

Collection Systems Operations Facility Structural Steel Package
Renovation
Post-Bid
$500,000 est. value
Rockford, IL 61109

Welding Consumables - Metals
Term Contract
Post-Bid
Gurnee, IL 60031

Structural Steel Repair
Alteration
Results
Monee, IL 60449

Metamora Township High School HVAC Renovation
Alteration
Results
Metamora, IL

Furnish and Deliver Steel and Stainless Steel to Various Locations for a One-year Period
Term Contract
Post-Bid
$205,000 est. value
Chicago, IL

Safety Town Bridge Railing
Alteration
Results
Peoria, IL 61614

Scranton Avenue Underpass Steel Railing Repairs
Alteration
Post-Bid
$850,000 est. value
Lake Bluff, IL 60044

Salt Storage Building Repairs
Renovation
Results
Crystal Lake, IL 60014

Escalator Handrail and Field Splicing As Required
Term Contract
Post-Bid
Chicago, IL 60604

Steel Repairs, Hanger Repairs, and Other Related Items on the Structure
Alteration
Results
IL

Steel Supplies
Term Contract
Post-Bid
Chicago, IL 60604

New York Street Bridge West Abutment Stairs Replacement
Alteration
Results
$200,000 est. value
Aurora, IL 60506

Exterior Steel Renovations at the Woodridge Public Library
Renovation
Post-Bid
$200,000 CJ est. value
Woodridge, IL 60517

New Will County Morgue/Coroner Facility - Bid Package No. 2
Alteration
Results
$80,000 est. value
Joliet, IL 60433

Last Updated 09/28/2023 10:24 AM
Project Title

Conversion of Jefferson Avenue and Adams Street to Two-Way Traffic

Physical Address View project details and contacts
City, State (County) Peoria, IL 61603   (Peoria County)
Category(s) Single Trades
Sub-Category(s) Steel
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $14,887,600 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Conversion of Jefferson Avenue and Adams Street to Two-Way Traffic, from Walnumt Street to Fayette Street in Peoria. Region 3 District 4 Federal Project # 1CDZ(284) County(s) Peoria Key Route(s) FAU 6673 FAU 6674 Marked Route(s) Jefferson Ave. & Adams St. Section(s) 18-00377-00-SP (PEORIA) State Job #(s) C-94-021-21 PPS #(s) 0-00108-4001 4-10741-0000 Questions not accepted as of September 12, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, September 12, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 073 - Conversion of Jefferson Avenue and Adams Street to Two-Way Traffic

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents