Similar Projects
Huntley Hall Renovation and Addition
Renovation, Addition - 31,404 SF
Bidding
$7,000,000 to $8,000,000 est. value
Richmond, VA 23220

On Demand Construction and Skilled Trades Services
Renovation
Bidding
$500,000 est. value

VCU Johnson Hall Envelope Repairs
Post-Bid
Richmond, VA 23220

MCV Alumni House Second Floor Renovations
Renovation
Post-Bid
Richmond, VA

VCCS System Office Interior Alterations
Renovation
Results
Richmond, VA

VCU Sanger 9 Surgery Innovation Suite
Renovation - 8,000 SF
Results
$344,488 est. value
Richmond, VA 23298

Grant House 1st and 3rd Floor Renovation
Renovation
Post-Bid
Richmond, VA 23284

Renovate 6th Floor Labs - Sanger Hall
Renovation
Post-Bid
Richmond, VA 23284

Virginia Commonwealth University Brandcenter Basement Renovation
Renovation
Post-Bid
Richmond, VA 23284

Brandt and Rhoads Halls Director and GA Apartment
Renovation
Post-Bid
Richmond, VA

Hermes A. Kontos Medical Sciences Building; Mezzanine Level Alterations
Renovation
Post-Bid
Richmond, VA

VCU Re-Pointing Bricks and Misc Exterior Repairs Raleigh Building
Renovation
Post-Bid
Richmond, VA 23284

VCU Chimney Repair Thurston House
Post-Bid
Richmond, VA 23284

VCU Honors College Office and Classroom Relocation
Renovation - 7,302 SF
Post-Bid
Richmond, VA 23220

VCU Physical Plant Warehouse #1 Alterations
Renovation
Post-Bid
Richmond, VA 23219

Reported 05/19/2020 12:00 AM
Project Title

Robert Blackwell Smith Building; Alterations to Labs 522, 524and 526

Physical Address View project details and contacts
City, State (County) Richmond, VA   (Chesterfield County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as a lab alteration project covering 1,324 total square feet, located on the sixth floor of the Smith Building. The project scope includes construction and outfit of two wet labs. Mechanical, electrical, plumbing, and fire alarm work is part of this project scope. Lab casework will be owner-furnished, and general contractor installed and coordinated. Plumbing fixtures will be ownerfurnished and general contractor installed.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents