Similar Projects
2nd and Lincoln Paving Improvements
Infrastructure
Bidding
$250,000 est. value
Casper, WY 82605

2022 12th Street Improvements
Infrastructure
Bidding
$1,100,000 est. value
Casper, WY 82605

Lawrence Street Rehabilitation - Phase I
Post-Bid
Belle Fourche, SD 57717

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Sweetwater Jct. - Riverton (Beaver Rim South & Middle Section)
Infrastructure
Results
Riverton, WY

Crack Seal
Infrastructure
Results

District 5 Pipe Lining
Infrastructure
Results
WY

Structures (82' Prestressed Girder, 5-12'x11 CIP RCBC, 103' Prestressed Girder, 150' Continuous Concrete) and Approach Grading
New Construction, Infrastructure
Results

WY Flap 407(1) Kortes Road
Term Contract
Results
Alcova, WY

Milling Plant Mix, Bituminous Pavement Surfacing (Recycle), Chip Seal and Miscellaneous
Infrastructure
Results
Atlantic City, Jeffrey City, WY 82520

Cold Milling, Asphalt Concrete Resurfacing (124K Tons), Pipe Work, Guardrail Upgrades
Infrastructure
Results

Last Updated 04/27/2022 04:54 AM
Project Title

Waltman - Shoshoni

Physical Address View project details and contacts
City, State (County) Belle Fourche, SD 57717 (Butte (SD) - Fremont, Natrona (WY) Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bituminous Surfacing, Traffic Control, Surfacing, Chip Seal And Miscellaneous Work On Approximately 10.40 Miles On Us 20/26 Beginning At Rm 51.57 Between Waltman And Shoshoni. 1 106.05110 Field Laboratory 1.000 Ls 2 106.05200 Contractor Testing 1.000 Ls 3 109.04000 Force Account Work 20,000.000 $$ 4 109.08000 Mobilization 1.000 Ls 5 202.03305 Milling Plant Mix 8,700.000 Sy 6 209.01000 Water 235.000 Mg 7 210.03300 Motor Grader 80.000 Hr 8 215.01000 Contractor Storm Water Control 1.000 Ls 9 216.03100 Seeding (Pls) 178.000 Lb 10 216.03120 Fertilizer Type i 380.000 Lb 11 216.03900 Dry Mulch 20.000 Ton 12 301.01030 Crusher Run Subbase 5,170.000 Cy 13 401.02000 Hot Plant Mix 15,700.000 Ton 14 401.02055 Hot Plant Mix Approaches 184.000 Ton 15 401.03322 Asphalt Binder (Pg 64-28) 930.000 Ton 16 407.01000 Tack Coat 36.000 Ton 17 409.03075 Chip Seal (Overshoot) 233,000.000 Sy 18 409.03085 Emulsified Asphalt Modified 408.000 Ton 19 409.03090 Emulsified Asphalt Overshoot 72.000 Ton 20 413.01000 Hydrated Lime 148.000 Ton 21 702.50700 Reset Delineators 622.000 Ea 22 703.03100 Flagging 2,500.000 Hr 23 703.03110 Temporary Traffic Control 1.000 Ls 24 703.03200 Sequential Chevron 1.000 Ls 25 799.70105 Thermoplastic Pavement Markings 652.000 Sf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents