Similar Projects
Lift Station and Waste Water Treatment Plant Site Improvements to Serve Oxford Place Phase 1
Alteration
Post-Bid
McKinney, TX

Offsite Lift Station Improvements for Venetian at Weston
Renovation
Post-Bid
TX

Reuse Pump Station Improvements
Results
$10,000,000 to $14,000,000 est. value
Frisco, TX

Pump Repairs and Pumping Station Services
Results
$65,000 est. value
Allen, TX

Wastewater Treatment Plant 3 Phase 1 0.25 MGD
New Construction
Post-Bid
Farmersville, TX

Construction of Stonebridge Lift Station Phase I Improvements
New Construction
Results
$835,000 est. value
McKinney, TX

Lift Station Improvements for Cypress Creek
Renovation
Post-Bid
TX

Bear Creek SUD Pump Station 2 Improvements
Results
Lavon, TX 75166

CR 596 Pump Station Project
Results
$2,880,100 est. value
Josephine, TX 75164

North McKinney Transfer Lift Station Project and North McKinney Transfer Force Main Project - Phase 1 and 2 Improvements
Infrastructure
Results
$70,000,000 to $95,000,000 est. value
McKinney, TX

High Point Lift Station Improvements
Renovation
Results
$325,000 est. value
Celina, TX 75009

McKinney Ranch Pump Station Improvements Project
Renovation
Results
$13,500,000 est. value
McKinney, TX 75070

Stacy Road Pump Station 1 Rehabilitation
Renovation
Results
$3,500,000 est. value
Allen, TX 75013

Sunset Boulevard Lift Station
New Construction
Results
$3,375,000 est. value
Celina, TX

Upper East Fork Interceptor System Sloan Creek Lift Station
New Construction
Results
$9,000,000 est. value
Fairview, TX

Last Updated 05/30/2022 04:53 AM
Project Title

Celina Road Pump Station Phase 3

Physical Address View project details and contacts
City, State (County) Celina, TX 75009   (Collin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,890,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of two (2) existing pumps, associated electrical equipment, and piping at the existing Celina Road Pump Station. The Work will also include an On-Site Septic System (OSSF) design and construction including the addition of a new lift station pump, controls, and force main to a new septic tank and drain field.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Turf and Grasses.
Division 33 - Utilities.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents