Similar Projects
Construction of Facilities - City of Mount Vernon
New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Mount Vernon, WA 98273

South Commercial Avenue Corridor Plan - Phase II Commercial Avenue from 14th to 34th - City of Anacortes
Infrastructure
Conception
$60,000,000 CJ est. value
Anacortes, WA 98221

I-5 / Maddox Creek - Fish Passage
Infrastructure
Design
$15,457,000 CJ est. value
Mount Vernon, WA 98273

The Crossings Cottages Development
New Construction, Infrastructure
Design
$800,000 CJ est. value
Anacortes, WA 98221

Reiter Foothill Trailhead
Infrastructure
Bidding
$1,621,635 CJ est. value
Sedro Woolley, WA 98284

Darrington Wood Innovation Center
Infrastructure
Post-Bid
$9,650,000 est. value
Darrington, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

WWTP Textile Pod Repair and Improvements
Renovation
Results
$350,000 to $430,000 est. value
Sedro-Woolley, WA

Little Mountain Sky Ridge Road Pipeline Project
Infrastructure
Results
$982,504 CJ est. value
Mount Vernon, WA 98274

Tommy Thompson Trestle and Causeway Replacement - City of Anacortes
Infrastructure
Construction
$350,000 CJ est. value
Anacortes, WA 98221

Fidalgo Bay Road Reconstruction - City of Anacortes
Infrastructure
Conception
$9,500,000 CJ est. value
Anacortes, WA 98221

SR 530/Sauk River Roadway Embankment - Stabilization Top
Infrastructure
Design
$5,055,000 CJ est. value
Concrete, WA 98237

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Lake Cavanaugh Access Redevelopment Phase 2
Infrastructure
Results
$83,308 CJ est. value
Mount Vernon, WA 98273

R Avenue Safety and Mobility Improvements - City of Anacortes
Infrastructure
Conception
$5,427,164 CJ est. value
Anacortes, WA 98221

Last Updated 08/14/2023 07:33 PM
Project Title

MVWWTP Shop Building (Rebid)

Physical Address View project details and contacts
City, State (County) Mount Vernon, WA 98273   (Skagit County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,450,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

PN-2304, 22-0595 The Project consists of furnishing all labor, materials and other incidentals for the construction of a new Type V-A, wood-framed, 1-story, 4,000 S.F shop building complete with on and off-site improvements. The amount of the bid guaranty shall be at least five percent (5%) of the total amount of the bid. The City of Mount Vernon reserves the right to reject any or all bid proposals, revise or cancel the work, complete the work by other means, or to postpone the bid award by up to thirty (30) days after bid opening Question Submission Deadline:August 4, 2023, 5:00pm

Details

1 Story Above Grade, 4,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents