Similar Projects
Aldi / Alpena
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Alpena, MI 49707

Aldi / Alpena
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Alpena, MI 49707

Alpena ANG Hangar and Maintenance Shops
New Construction, Infrastructure - 24,000 SF
Bidding
$20,000,000 CJ est. value
Alpena, MI 49707

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Herron Road Reconstruction
Infrastructure
Post-Bid
Alpena, MI

Traffic Signal Modernizations and Sidewalk Ramp Upgrades on Various Routes
Infrastructure
Results
East Tawas, Rose City, West Branch, MI

Hot Mix Asphalt Base Crushing, Shaping, and Resurfacing and Pavement Markings on Long Lake Road
Infrastructure
Results
$572,000 est. value
Alpena, MI 49707

Bingham Apartments / Hope Network Affordable Independent Living & Services
Addition, Demolition, Infrastructure, Build-out
Design
$8,000,000 CJ est. value
Alpena, MI 49707

Overband Crack Sealing
Infrastructure
Post-Bid
MI

Alpena Regional Airport - Rehabilitate Runway 1-19 TDZ Pavement and BAK-12 Aircraft Arresting Systems - Phase 1 North
Infrastructure
Results
$19,664,000 CJ est. value
Alpena, MI 49707

Parking Lot At Pied Piper School
Alteration
Post-Bid
Alpena, MI

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Beaver Lake Lake Level Control Structure
Infrastructure
Post-Bid
$500,000 CJ est. value
Ossineke Township, MI 49753

Alpena Regional Airport
Infrastructure
Post-Bid
$300,000 CJ est. value
Alpena, MI 49707

Various Culvert Replacement
Infrastructure
Post-Bid
$400,000 CJ est. value
Alpena, MI 49707

Last Updated 06/03/2023 04:33 AM
Project Title

DNR Alpena Fisheries Research Station Sidewalk and Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Alpena, MI 49707   (Alpena County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $223,313 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

OWNER reserves the right to remove salvage items for use by OWNER. These items shall be identified in the Contract Documents or shall be removed by OWNER prior to the issuance of the Notice to Proceed NIGP CODES: 90924, 90976, 91200, 91223, 91244, 91375, 91382 CONTRACTOR may recycle demolition debris at a licensed or permitted recycling center, however, all other debris must be disposed of at a licensed or permitted disposal facility The prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. The DTMB prevailing wage is satisfied when wages plus fringe benefits are equal to or greater than the required rate. This Section includes furnishing, installing, maintaining, and removing at project completion, Soil Erosion and Sedimentation Control devices. Devices include silt fence, straw bales, turbidity barriers, temporary gravel construction entrance/exits, inlet filters, ditch sediment traps, etc. Work includes the removal and disposal of the building materials and debris including the removal and disposal of miscellaneous site debris, including but not limited to building area debris, woods, piping materials, bricks, roof materials, metal equipment and all other non-specified material and debris found at the site. Work includes the removal and disposal of the building debris and concrete materials generated by the demolition of the structures listed above. Removal and disposal of concrete, rebar, and steel is incidental to the project. It is recommended that steel be recycled. CONTRACTOR may recycle concrete and asphalt to reduce cost. Question Deadline 04/12/2023 at 12:00 PM ET

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents