Similar Projects
Last Updated | 09/08/2022 11:35 AM |
Project Title | Laguna Seca Recreation Area Start-Finish Bridge and Track Overlay |
Physical Address | View project details and contacts |
City, State (County) | Salinas, CA 93908 (Monterey County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $9,290,840 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of September 8, 2022, a general contractor has been awarded and construction is expected to start November 2022. The County of Monterey (County) - Department of Public Works, Facilities and Parks proposes to replace the existing Start-Finish pedestrian bridge and repave the existing race track. The Start-Finish Bridge work generally consists of demolition of the existing Start-Finish bridge, starter's platform, columns and footings; and construction of two prefabricated pedestrian bridge spans and concrete bridge footings and abutments; a starter's stand; concrete pedestrian walkways, ramps and stairs; railings and fencing; retaining walls; earthwork and drainage improvements; and utility relocations. The racetrack repaving work generally consists of micro milling and cold planing of AC pavement; HMA patching and paving; overlaying with specialty racetrack HMA mix; construction of HMA shoulders; chip sealing shoulder areas; reconstruction of racetrack kerbs; shoulder grading; drainage improvements; and other miscellaneous construction. The Engineer's Estimate for the construction cost is approximately $9,725,000. 1. Relocation of Joint Utility Pole - Contractor shall coordinate schedule for pole relocation with PG&E. 2. Timing loop installation - Contractor shall coordinate schedule for timing loop installation. Contractor shall allow at least 5 weekdays (Monday to Friday) for the work, beginning 7 calendar days after completion of racetrack repaving. 3. Low voltage system - Contractor shall coordinate schedule with County's low voltage contractor. Contractor shall allow at least 5 weekdays (Monday to Friday), prior to demolition, for removal of existing system infrastructure (demolition), and at least 20 weekdays (Monday to Friday) for installation and testing of low voltage system infrastructure near the end of the construction period. 4. Racetrack striping and marking - Contractor shall coordinate schedule for racetrack striping and marking. Contractor shall allow at least 10 weekdays (Monday to Friday) for the work, beginning 7 calendar days after completion of racetrack repaving. 5. Kerb painting - Contractor shall coordinate schedule for kerb painting. Contractor shall allow at least 3 weekdays (Monday to Friday), beginning 14 calendar days after completion of kerb construction. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |