Similar Projects
Williams Road UD/Street/Streetscape and Median Island - 9071 - City of Salinas
Infrastructure
Conception
$7,513,800 CJ est. value
Salinas, CA 93905

West Laurel Drive Improvements - 9145 - City of Salinas
Infrastructure
Conception
$150,000 CJ est. value
Salinas, CA 93906

Rehab Pavement
Infrastructure
Design
$23,350,000 CJ est. value
Castroville, CA 95012

Install Beautification, Transportation Art, and Safety Measure Enhancement Project in Caltrans R/W
Infrastructure
Design
$1,860,000 CJ est. value
Greenfield, CA 93927

Cold Plane, Place HMA and RHMA and Shoulder Widening
Infrastructure
Bidding
$2,400,000 CJ est. value
Monterey, CA 93940

RFP Construction Manager - SURF! Busway and Bus Rapid Transit Project
Infrastructure
Bidding
$11,000,000 CJ est. value
Marina, CA 93933

Parking Lot Sweeping and Pressure Washing and or Steam Cleaning Services at the Salina DMV Field Office
Term Contract, Infrastructure
Post-Bid
Salinas, CA 93906

Monte Bella Subdivision Street Sweeping
Infrastructure
Post-Bid
Salinas, CA

Carmel River Floodplain Restoration and Environmental Enhancement (CRFREE) Project - Phase 1
Renovation
Results
$4,388,222 CJ est. value
Carmel, CA 93923

Boronda Road Congestion Relief - 9510 - City of Salinas
Infrastructure
Conception
$43,810,000 CJ est. value
Salinas, CA 93907

Install Beautification, Transportation Art, and Safety Measure Enhancement
Infrastructure
Design
$492,000 CJ est. value
Greenfield, CA 93927

California Avenue Pedestrian Crossing Installation
Infrastructure
Bidding
$300,000 CJ est. value
Marina, CA 93933

FY 21/22 Pavement Rehabilitation Project
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Seaside, CA 93955

David Avenue Street Rehabilitation - CIP 23-04 - City of Pacific Grove
Infrastructure
Conception
$400,000 CJ est. value
Pacific Grove, CA 93940

Marina Parking Lot Improvement Project
Infrastructure
Bidding
$3,581,730 CJ est. value
Monterey, CA 93940

Last Updated 09/08/2022 11:35 AM
Project Title

Laguna Seca Recreation Area Start-Finish Bridge and Track Overlay

Physical Address View project details and contacts
City, State (County) Salinas, CA 93908   (Monterey County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $9,290,840 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 8, 2022, a general contractor has been awarded and construction is expected to start November 2022. The County of Monterey (County) - Department of Public Works, Facilities and Parks proposes to replace the existing Start-Finish pedestrian bridge and repave the existing race track. The Start-Finish Bridge work generally consists of demolition of the existing Start-Finish bridge, starter's platform, columns and footings; and construction of two prefabricated pedestrian bridge spans and concrete bridge footings and abutments; a starter's stand; concrete pedestrian walkways, ramps and stairs; railings and fencing; retaining walls; earthwork and drainage improvements; and utility relocations. The racetrack repaving work generally consists of micro milling and cold planing of AC pavement; HMA patching and paving; overlaying with specialty racetrack HMA mix; construction of HMA shoulders; chip sealing shoulder areas; reconstruction of racetrack kerbs; shoulder grading; drainage improvements; and other miscellaneous construction. The Engineer's Estimate for the construction cost is approximately $9,725,000. 1. Relocation of Joint Utility Pole - Contractor shall coordinate schedule for pole relocation with PG&E. 2. Timing loop installation - Contractor shall coordinate schedule for timing loop installation. Contractor shall allow at least 5 weekdays (Monday to Friday) for the work, beginning 7 calendar days after completion of racetrack repaving. 3. Low voltage system - Contractor shall coordinate schedule with County's low voltage contractor. Contractor shall allow at least 5 weekdays (Monday to Friday), prior to demolition, for removal of existing system infrastructure (demolition), and at least 20 weekdays (Monday to Friday) for installation and testing of low voltage system infrastructure near the end of the construction period. 4. Racetrack striping and marking - Contractor shall coordinate schedule for racetrack striping and marking. Contractor shall allow at least 10 weekdays (Monday to Friday) for the work, beginning 7 calendar days after completion of racetrack repaving. 5. Kerb painting - Contractor shall coordinate schedule for kerb painting. Contractor shall allow at least 3 weekdays (Monday to Friday), beginning 14 calendar days after completion of kerb construction.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents