Similar Projects
Spot Graveling in Various Locations in Karlsruhe Township
Term Contract
Sub-Bidding
Karlsruhe, ND 58744

Class 13 Aggregate and Crushed Concrete
Term Contract
Post-Bid
ND

ECRWD - Facility Expansion
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Thompson, ND 58278

Airfield Pavement Slurry Seal
Infrastructure
Results
$231,443 CJ est. value
Edgeley, ND 58433

Street Improvement District 224
Infrastructure
Results
$2,480,000 est. value
Mandan, ND

Paving and Rehab/reconstruction
Infrastructure
Construction
$2,947,620 CJ est. value
Fargo, ND 58102

Concrete Pavement Repair
Infrastructure
Post-Bid
$800,000 CJ est. value
Wahpeton, ND 58075

Milling, HMA Overlay, Curb Ramps, CPR, Curb, and Lighting Improvements
Infrastructure
Results
$1,258,354 CJ est. value
Courtenay, ND 58426

Chip Seal
Infrastructure
Post-Bid
$800,000 CJ est. value
Beach, ND 58621

Water, Sewer, Storm and Street Improvement District No. 2022-11 Cub Creek 2nd Addition
Infrastructure
Results
$16,111,086 CJ est. value
Horace, ND 58047

Greenhouse Concrete Replacement
Infrastructure
Post-Bid
$800,000 CJ est. value
Fargo, ND 58102

Milling and RAP Hot Mix Asphalt Overlay
Infrastructure
Results
$2,634,830 CJ est. value
Valley City, ND 58072

Far - South Ga Apron Reconstruction
Infrastructure
Post-Bid
$400,000 CJ est. value
Fargo, ND 58102

Sanitary Lift Stations
Infrastructure, Renovation
Results
$1,196,395 CJ est. value
West Fargo, ND 58078

Kindred Airport-construct Runway 29 Turnaround, Hangar Taxilane, and Access Road
Infrastructure
Post-Bid
$400,000 CJ est. value
Kindred, ND 58051

Last Updated 08/19/2023 04:31 AM
Project Title

High Tension Guardrail Repair - Valley City and Fargo Districts

Physical Address View project details and contacts
City, State (County) Valley City, ND 58072   (Barnes County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Any questions regarding this solicitation should be referred to the procurement officer (including problems opening attachments.) Questions Due: 08/01/2023 05:00 PM CT. The intent of this invitation to bid is to procure the services of a contractor who will independently set up lane closures and successfully repair high tension median cable guardrail in compliance with the manufacturers requirements along I-94 and I-29 for the North Dakota Department of Transportation (NDDOT). The high-tension median cable guardrail systems in place are manufactured by Brifen USA Inc. and Gibraltar Global. All Subcontractors performing work under the Contract are required to maintain the same scope of insurance required of the Contractor. The Contractor shall be held responsible for ensuring compliance with those requirements by all Subcontractors. Buyer: Jamie Bostyan Telephone Number: 701.328.2571 Email: jtbostyan@nd.gov The intent of this invitation to bid is to procure the services of a contractor who will independently set up lane closures and successfully repair high tension median cable guardrail in compliance with the manufacturer's requirements along I-94 and I-29 for the North Dakota Department of Transportation (NDDOT). The high-tension median cable guardrail systems in place are manufactured by Brifen USA Inc. and Gibraltar Global. The current locations for high tension median cable guardrail repair are located within the Valley City and Fargo Districts. NDDOT performed an inspection, located the damaged segments, and created summaries of the damaged segments separated by District, Fargo and Valley City. Fargo District's summary of damaged segments are separated by manufacturer in Attachment 1, Fargo District Brifen Segments and Attachment 2, Fargo District Gibraltar Segments. Valley City District's summary of damaged segments includes both manufacturers and is provided in Attachment 3, Valley City District Segments. The work listed in the Attachments for both Districts must be completed by October 15, 2023. In the Bid Response below, NDDOT requests bidders to provide a total cost response for the entirety of each District's repairs noted in Attachments 1, 2, and 3. Bidders are instructed to review each Attachment and are welcome to perform an inspection of their own to provide a total cost response for each District's repairs. Bidders are to use the inventories when developing their bid response for each District's repairs as listed in Attachment 4, Fargo Inventory List, and 5, Valley City Inventory List. Inventory required beyond what is listed in each District shall be provided by the contractor and reflected in the bidder's response. Bid responses shall include the following charges for, but not be limited to, mobilization, per diem, lodging, travel, mileage, traffic control, and hardware.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents