Similar Projects
Dog Exercise Area Site Improvements at Duck Farm Forest Preserve
Infrastructure
Design
$3,000,000 CJ est. value
Lindenhurst, IL 60046

Dog Exercise Area Site Improvements at Duck Farm Forest Preserve
Infrastructure
Design
$3,000,000 CJ est. value
Lindenhurst, IL 60046

RFP Construction Manager - Deerpath Community Park Synthetic Turf Fields Project
Infrastructure
Bidding
$200,000 CJ est. value
Lake Forest, IL 60045

RFP Construction Manager - Deerpath Community Park Synthetic Turf Fields Project
Infrastructure
Bidding
$200,000 CJ est. value
Lake Forest, IL 60045

Forest Park Beach Sand Nourishment
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Lake Forest, IL 60045

Snow Removal Metra Lots
Term Contract
Sub-Bidding
Fox Lake, IL 60020

2021 Curb and Sidewalk Program
Post-Bid
Grayslake, IL

2021 Crestfield Subdivision Resurfacing
Post-Bid
Indian Creek, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

Midwest Industrial - Village of Libertyville
Addition, Build-Out - 480,580 SF
Pending Verification
Libertyville, IL 60048

Bridges - St. Johns Avenue - City of Highland Park
New Construction, Infrastructure
Design
$490,000 CJ est. value
Highland Park, IL 60035

Edina Park Bike Trail
Infrastructure
Bidding
$265,000 CJ est. value
Zion, IL 60099

2021 Parking Lot Improvements at Lakes Community& Antioch HS
Post-Bid
Antioch, Lake Villa, IL 60002

2021 Tennis Court Improvements
Results
Grayslake, IL

Last Updated 08/09/2022 12:35 PM
Project Title

Shepard Park Renovations

Physical Address View project details and contacts
City, State (County) Deerfield, IL 60015   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $786,554 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**Project was awraded to Chicago Paving in the amount of $700,000.00 plus the Alternate 1 bid of $86,554.40 for a total of $786,554.40. Pickleball Court Construction / Baseball Field Renovation All bids must include a ten percent (10%) Bid Surety and a duly executed and notarized Bid Certification under Section 33E- 11 of the criminal code of 1961, as amended, on the form provided by the Deerfield Park District. No bidder may withdraw their proposal after the hour set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding thirty (30) calendar days. The Deerfield Park District may reject any or all the bids on any basis and without disclosure of a reason. The failure to make such a disclosure shall not result in accrual of any right, claim, or cause of action by any unsuccessful Bidder against the Deerfield Park District.

Details

Division 03 - Concrete, Precast Concrete.
Division 10 - Specialties, Signage, Wall and Door Protection, Bumper Guards, Protective Corridor Handrails.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents