Similar Projects
Bill Miller Bar-B-Q Headquarters
New Construction - 335,000 SF
Design
$60,000,000 est. value
San Antonio, TX 78227

Fasken Oil & Ranch Corporate Campus
New Construction - 219,000 SF
Design
$10,000,000 CJ est. value
San Antonio, TX 78257

Idea New Regional Office Bid Package #2
New Construction - 15,157 SF
Post-Bid
San Antonio, TX 78216

North Star Mall - Forever 21 Redevelopment
Renovation - 92,917 SF
Post-Bid
San Antonio, TX 78201

Maintenance Office Renovations
New Construction, Renovation, Addition - 7,940 SF
Results
$2,230,000 est. value
San Antonio, TX 78216

CMAR Construction of A Civic Center and City Hall Renovation
Renovation - 7,800 SF
Results
Less than $1,200,000 est. value
Fair Oaks Ranch, TX 78015

Olympic Transport Shell and Office Building
New Construction - 71,000 SF
Construction
$3,000,000 est. value
San Antonio, TX 78219

HEB Fred Road Office
Build-Out - 5,345 SF
Construction
San Antonio, TX 78201

AWS Data Center
New Construction - 109,600 SF
Design
$10,000,000 CJ est. value
San Antonio, TX 78245

Computer Solutions Headquarters
Build-Out - 20,540 SF
Post-Bid
$625,620 est. value
San Antonio, TX

Culebra Business Complex
New Construction, Build-Out - 16,824 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
San Antonio, TX 78251

Life Storage #321
New Construction - 57,390 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
San Antonio, TX 78215

Shepherd of the Hills - Multipurpose Building
New Construction - 30,238 SF
Construction
San Antonio, TX 78240

Meals on Wheels
New Construction - 43,755 SF
Post-Bid
San Antonio, TX 78217

Hills & Dales Building B Shell and Healing Hands Veterinary Build-Out
New Construction, Build-Out - 8,550 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
San Antonio, TX 78255

Last Updated 07/28/2021 10:52 AM
Project Title

Repair and Renovate 2nd Floor Offices B.5616 at JBSA Lackland AFB, TX

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13). The contractor shall provide 95%, and 100% design drawing sets for review and final issue of construction for areas 1 and 2. Construction will consist but not limited to removing existing walls and associated doors, furnish and install new drywall partitions and doors to create new offices and meeting rooms, removing existing carpet and under padding and replacing with new carpet tiles/squares, furnish and install new electrical in the new walls and extend existing electrical receptacle boxes, install flush with new wall surfaces, install new Cat 6 phone and computer outlets, removing and modifying existing 2x2 acoustical tile ceiling and relocating existing ceiling light fixtures are required to accommodate wall partitions removed and new all partitioned installed. The contractor shall also analyze and modify existing HVAC ductwork layout to provide proper air supply and return to newly constructed rooms/offices. The contractor shall also install additional new fire protection devices, pull stations, heat detectors, and alarm devices as required to meet code for the areas created and renovated. The contractor shall also furnish and install a ventilated cabinet around existing telephone equipment panel, and paint new walls and new doors to match existing adjacent surfaces. Install new light switches with branch circuit wiring, and furnishing and installing new telephone and computer drops.

Details

Office, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents