Similar Projects
Santa Clara Truman Drive Landslide Project
Post-Bid
Santa Clara, UT 84765

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Specialized Precast Concrete Box Culvert
Results

Construction of The Virgin River Stream Restoration Project
Results
Less than $1,116,310 est. value
Washington, UT

Drainage Improvements and Pavement Maintenance Project
Post-Bid
Saint George, UT 84770

Richfield Maintenance Yard Stormwater Management Structures
Results

Bloomington Hills Drive Roadway Widening
Post-Bid
Saint George, UT 84770

Southern Parkway 84" Rcp Carrier Casing Project
Results
Less than $80,000 est. value
UT

Horseman Park Drive Landscape and Drainage
Results
Less than $234,165 est. value
Saint George, UT

Fort Pierce Wash Sediment Removal
Results
Saint George, UT 84770

Pine Valley Reservoir Toe Drain
Results
$250,000 to $500,000 est. value
Pine Valley, UT 84781

Virgin River South Trail Repairs Bloomington Park to Las Colinas Park
Results
Less than $323,188 est. value
Saint George, UT 84790

Virgin River South Trail - Rustic Trailhead to Springs Park
Results
Less than $826,510 est. value
Saint George, UT 84770

Culvert Pipe Replacement SR 190 Wasatch Boulevard
Results

Construction of the WWTP Rough Grading Project
Results
Less than $300,000 est. value
Saint George, UT 84770

Last Updated 09/03/2019 12:44 PM
Project Title

1525 North Groundwater Project

Physical Address View project details and contacts
City, State (County) Saint George, UT 84770   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $182,600
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work includes labor, equipment and materials to construct the 1525 North Groundwater Project which includes, installation of groundwater drain, and miscellaneous drainage improvements.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents