Similar Projects
Lower Mill River Interceptor Rehabilitation - Phase 1
Post-Bid
New Haven, CT

On-Call Water Utility Repair Service
Term Contract, Infrastructure
Post-Bid
Waterbury, CT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water System Audit and Leak Detection Survey
Results
Waterbury, CT

Installation Of Ductile Iron And Hdpe Water Mains
Infrastructure
Post-Bid
New Haven, CT

J045--Solicitation | Facility Repairs
Results
West Haven, CT 06516

Lake Gaillard Water Treatment Plant Raw Water Valves Replacement
Infrastructure
Post-Bid
North Branford, CT 06471

Water Meters
Results
New Haven, CT

Crestwood Drive Water Main Extension Project
Infrastructure
Post-Bid
Naugatuck, CT 06770

Flanged Plug Valves
Results
Wallingford, CT

Crestwood Drive Water Main Extension
Infrastructure
Post-Bid
Naugatuck, CT

Valve Box Risers, Covers and Debris Plugs
Results
Waterbury, CT

Woodhouse Avenue, Center Street and Norman Avenue Water Mains, Contract No. 37
Infrastructure
Results
Wallingford, CT 06493

Water Main Cleaning and Re-Lining
Infrastructure
Results
Meriden, CT

Workstations for the Water and Sewer Division Engineering Section
Infrastructure
Results
Wallingford, CT

Reported 06/02/2022 12:00 AM
Project Title

Water Main Extension - Naugatuck River Greenway Phase I

Physical Address View project details and contacts
City, State (County) Waterbury, CT 06706   (New Haven County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pre-Qualified Contractor to extend an existing water main and provide a new Fire Hydrant pertaining to the City's Naugatuck River Greenway Phase I project. As part of the Naugatuck River Greenway Phase I project, the City of Waterbury is requesting proposals to extend the Connecticut Water Company's Watermain in South Main Street north to Platts Mill to provide water service to a Restroom being constructed near the corner of Platts Mill and South Main Street intersection, and to provide a new Fire Hydrant in the vicinity, all as described in more detail in the Special Provisions (also referred to in the Contract Documents as Technical Specifications) and Drawing for this RFP. The Selected Proposer (hereinafter "Contractor") shall extend the existing watermain with 8" D.I.P. provide valves, deadend blow offs, a 1" service line, a 6" hydrant service line and hydrant; conduct all necessary chloronation and testing as required by Connecticut Water, and repair pavement and replace loop detectors impacted by the proposed construction all as further detailed in the Special Provisions and Drawings included in the Proposal Documents for this RFP.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents