Similar Projects
RFP D/B - Recreation Park Playground
Infrastructure
Bidding
$700,000 CJ est. value
Raymore, MO 64083

RFQ Engineering - 268th Street Bridge #3470005 Replacement
Demolition, New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Grand River Township, MO 64701

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

2021 Curb Replacement
Infrastructure
Post-Bid
Pleasant Hill, MO

163rd Street Improvements
Results
Pleasant Hill, MO 64080

Resurface on Route A and Route B
Infrastructure
Results
$15,000,000 to $20,000,000 est. value

Caliber Collision Development
New Construction - 12,321 SF
Construction
$900,000 est. value
Belton, MO 64012

The Depot / Raymore
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Raymore, MO 64083

RFQ Engineering - Main Street Bridge #2050002 Replacement
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Harrisonville, MO 64701

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Intersection Improvements and Resurfacing
Infrastructure
Results
MO

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Resurface from 163rd Street
Infrastructure
Results
$7,500,000 to $10,000,000 est. value
MO

Express Oil Change and Tire engineers
New Construction
Post-Bid
Belton, MO

Highway 58 Waterline Replacement
Infrastructure
Results
$313,900 CJ est. value
Raymore, MO 64083

Last Updated 11/10/2022 04:15 PM
Project Title

Chase Bank Facility and Take 5 Oil Change / Belton

Physical Address View project details and contacts
City, State (County) Belton, MO 64012   (Cass County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Bank, Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a new Take 5 Oil change and Chase Bank Facility. The project is in the planning stage. As of March 18, 2022, no building permits have been submitted to the city. The project final development plan and lot split were approved by the Planning Commission on March 7, 2022.Information regarding the architect and general contractor has not been determined. A firm timeline for construction has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Doors and Frames, Special Function Doors, Panel Doors, Entrances and Storefronts, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents