Similar Projects
15th Avenue South West from 4th Street to C Street
Conception
$1,707,000 est. value
Cedar Rapids, IA 52404

CyRide Building Water Main Replacement - City of Ames
Infrastructure
Conception
$750,000 est. value
Ames, IA 50011

E Avenue North East from 19th Street to 20th Street
Design
$1,650,000 est. value
Cedar Rapids, IA 52402

2022 Water Pavement Patching Project
Infrastructure
Bidding
$189,759 est. value
Iowa City, IA

Wastewater System Improvements
New Construction, Infrastructure
Bidding
$3,450,000 est. value
Galva, IA

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

Water System Improvements
Term Contract
Post-Bid
Storm Lake, IA 50588

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

Clear Creek Bank Stabilization (North of Oakland Street) - City of Ames
Infrastructure
Conception
Ames, IA 50014

Huron Street Watermain Extension
Infrastructure
Bidding
$350,000 est. value
Emmetsburg, IA 50536

Water System Improvements - Well 1
Infrastructure
Post-Bid
Wahpeton, IA 51360

2021-22 Water Main Improvements
Results
$4,473,470 est. value
Bedford, IA

McFadden Farm Water Main Improvement(South Heacock Road From Chavenelle To Pennsylvania Avenue) - 740-2895
Infrastructure
Conception
$305,800 est. value
Asbury, IA 52002

2022 Water Main Improvements
Infrastructure
Bidding
$2,840,000 est. value
Lenox, IA

Reported 06/18/2022 12:00 AM
Project Title

6 Inch Lambs Grove Water Main Replacement

Physical Address View project details and contacts
City, State (County) Newton, IA   (Jasper County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General Nature of the Public Improvement 6" Lambs Grove Water Main Replacement Project consists of 460 LF of 6" C900, Trenched Watermain with pipe provided by Newton Water Works. 8" PCC Removal and Replacement. 6" Gate Valve's and T's Installation. 6' Hydrant Installation. Land Restoration and Seeding. Work on the improvement may commence upon approval of the contract by the Newton Water Board, and issuance of Notice to Proceed from the Public Works Director be completed as stated below.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents