Similar Projects
SR 145 - Slide Correction
Infrastructure
Conception
$327,000 CJ est. value
Birdseye, IN 47513

Hoosier Hills Marina AST Installation
Infrastructure
Bidding
Celestine, IN 47521

Division I - 750,000 Gallon Elevated Water Storage Tank
Infrastructure
Bidding
$4,000,000 CJ est. value
Dubois, IN 47527

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

HRJ Ln/Power Dr Reconstruction Project
Infrastructure
Post-Bid
$1,100,000 CJ est. value
Jasper, IN 47549

Holy Family Streets Improvement Project
Infrastructure
Results
$1,535,311 CJ est. value
Jasper, IN 47546

Holy Family Streets Improvement Project
Infrastructure
Results
$1,535,311 CJ est. value
Jasper, IN 47546

RFP Engineering - Project Development Services
Infrastructure
Pending Verification
$22,846,022 CJ est. value
Saint Anthony, IN 47575

Asphalt Resurface - SR 164
Infrastructure
Post-Bid
$2,111,270 CJ est. value
Saint Anthony, IN 47575

Orphan Wells - Dubois, Warrick, and Pike Counties
Infrastructure
Results
$2,380,200 CJ est. value
Jasper, IN 47546

Main Street Parking Lot Phase 2
Infrastructure
Post-Bid
$200,000 CJ est. value
Huntingburg, IN 47542

US Highway 231 Sanitary Sewer Relocation for DES
Infrastructure
Results
$135,428 CJ est. value
Huntingburg, IN 47542

Micro-surfacing of Selected Streets
Infrastructure
Post-Bid
$599,000 CJ est. value
Jasper, IN 47546

Construction of Improvements to Portions of County Road
Infrastructure
Results
$532,637 CJ est. value
Jasper, IN 47546

Last Updated 07/18/2023 06:33 AM
Project Title

Sanitary Sewer Main Relocation

Physical Address View project details and contacts
City, State (County) Birdseye, IN 47513   (Dubois County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $267,212 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary Sewer Main Relocation S.R. 145 Slide Correction Area Approximately 0.90 Miles South of S.R. 64 The Project consists of Installation of approximately 975 L.F. of 8-inch sewer main and appurtenances Installation of seven (7) 4-foot diameter manholes and appurtenances Installation of one (1) sewer lateral and appurtenances Retirement in place of existing sewer main Connection to two (2) existing manholes All interested citizens are invited to attend and should any citizens require special provisions, such as handicapped modifications or non-English translation personnel, the Town of Birdseye will provide such provisions as long as the request is made by July 6, 2022

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents