Similar Projects
NASCAR Speedway Commerce Center Business Park/Lincoln
New Construction - 3,000,000 SF
Conception
$640,000,000 est. value
Lincoln, AL 35096

Paxton Place Apartments
New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Huntsville, AL 35801

Toyota Expansion
Addition - 114,000 SF
Design
$52,000,000 est. value
Huntsville, AL 35810

Material Exploitation Center (MEC) at Redstone Arsenal
Addition, Demolition, Infrastructure - 9,890 SF
Bidding
$250,000,000 CJ est. value
Redstone Arsenal, AL 35808

SR 59 Capacity Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Gulf Shores, AL 36542

New Marion County Jail and Sheriffs Offices - MCJ-01 to MCJ-08
New Construction, Infrastructure
Sub-Bidding
$1,575,000 CJ est. value
Hamilton, AL 35570

Demolition and Structure Removal on SR-52
Demolition, Infrastructure
Sub-Bidding
$557,606 CJ est. value
Malvern, AL 36375

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Clinical Services & Research MRI Addition - Early Foundation
Results
$950,000 est. value
Tuscaloosa, AL 35404

Site Work for New Synthetic Turf
Results
Florence, AL 35630

Fedex Ground
New Construction - 141,002 SF
Construction
$2,000,000 est. value
Hope Hull, AL 36043

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

Hanwha Cimarron
New Construction
Pending Verification
$130,000,000 est. value
Opelika, AL

Last Updated 09/14/2022 12:34 PM
Project Title

Polyplex USA Phase 1 & 2 Expansion

Physical Address View project details and contacts
City, State (County) Decatur, AL 35601   (Morgan County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $90,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Expansion to an existing plant with the addition of a second thin BOPET film line. Design/Build firm has been selected. Construction schedule is not firm, but possible by first quarter 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents