Similar Projects
Fillmore Mixed-Use Development
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Denver, CO 80206

The Village at Loretto Heights
New Construction, Renovation
Conception
Denver, CO 80236

Two Tabor Center
New Construction - 635,071 SF
Design
Denver, CO 80202

Watershed
New Construction, Build-Out - 180,000 SF
Design
$72,000,000 est. value
Denver, CO 80216

1740 at The Atrium
Renovation
Post-Bid
Denver, CO 80274

Emerson Street Office Building Remodel
Renovation
Post-Bid
Denver, CO 80218

Century Link Remodel
Renovation - 11,000 SF
Construction
$750,000 est. value
Denver, CO

Griffith Mixed Use Development
New Construction - 177,500 SF
Construction
Denver, CO 80204

601 16th Street Mixed-Use
New Construction - 315,000 SF
Pending Verification
Denver, CO

29th Street Mixed Use Buildings
New Construction
Pending Verification
Denver, CO 80205

17th Street Property Redevelopment
New Construction, Renovation - 750,000 SF
Conception
Denver, CO 80202

3233 Quivas Street
New Construction, Demolition - 7,220 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Denver, CO 80211

6900 Layton
New Construction, Build-Out - 395,000 SF
Construction
$10,000,000 CJ est. value
Denver, CO 80237

633 17th Street Mixed Use
Renovation - 106,503 SF
Pending Verification
$18,000,000 est. value
Denver, CO

Train Denver Mixed Use
New Construction - 442,000 SF
Conception
$130,000,000 est. value
Denver, CO

Reported 04/24/2021 12:00 AM
Project Title

IH-21023 Remodel Basement CSP Offices Phase 1 - Capitol Annex

Physical Address View project details and contacts
City, State (County) Denver, CO 80261   (Denver County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Add Alternate #1 - Provide and install new carpet squares east office area approx. 2,150 s.f. 2. Add Alternate #2 Add Light well for east offices. 3. Add Alternate #3 Light well for west offices complete (work would occur after 7/01/2021). 4. Add Alternate #4 Construct Holding Room with new wall, 2 benches with restraints and paint. (wo rk would occur after 7/01/2021). Per mandatory pre- bid walk through description. 5. Add Alternate #5 Construct Evidence check- in & storage, evidence one-way lockers, 2 new 3070 doors (work with CSP for specialty security door locks, lockers) (work would occur after 7/01/2021). Per mandatory pre-bid walk through description.

Details

Office, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents