Similar Projects
Unit 4 Fire Suppression Additions
Addition
Bidding
Springfield, IL 62712

Fire Alarm System Upgrades
Alteration
Bidding
Aurora, Naperville, IL 60540

Inspection, Maintenance, Testing, Recharging and Repairing of Carbon Dioxide and Dry Chemical Fire Extinguishers and Accessories System-Wide
Term Contract
Post-Bid
Chicago, IL

Fire Testing and Inspection
Post-Bid
Chicago Heights, IL

Pirie & Arthur Ashe ES Fire Alarm System Install
Results
Chicago, IL 60619

Carroll ES & Fort Dearborn ES Fire Alarm System Install
Results
Chicago, IL

Pinckneyville Junior High School Office And Secure Vestibule Addition
Renovation, Addition
Bidding
Pinckneyville, IL 62274

Replace Fire Doors And Air Handler Units
Post-Bid
Less than $150,000 est. value
Ina, IL 62846

Fire Alarm System Installation - Avalon Park, Nino Heroes, Hoyne, Warren ES
Results
Chicago, IL 60617

Repair Fire Systems & Install Heating
Post-Bid
$25,000 to $100,000 est. value
IL 62225

Fire Alarm System Maintenance And Testing
Term Contract
Results
Rockford, IL 61104

Mil-Capital 183 Fire Alarm & Suppression Sys Insp
Post-Bid
Springfield, IL

FY20 Fire Protection Risk Management Surveys for Multiple Locations in IL and IN
Results
Chicago, Springfield, IL

Fire Suppression Repair
Post-Bid
Less than $25,000 est. value
Belleville, IL 62225

Replace Fire Doors And Air Handler Units
Results
Less than $100,000 est. value
Ina, IL 62846

Reported 07/03/2021 12:00 AM
Project Title

Fire Pump Test and Certify (Multiple Buildings)

Physical Address View project details and contacts
City, State (County) Great Lakes, IL 60088   (Lake County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to, furnishing all labor, supervision, management, tools, materials, equipment, transportation, and other items necessary to perform all work for testing and certifying 38 fire pumps in 36 buildings onboard Naval Station Great Lakes, Illinois.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents