Similar Projects
Last Updated | 03/28/2022 01:35 PM |
Project Title | Franklin Muskego Force Main Improvements |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI (Milwaukee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Performing exploratory excavation at two separate locations (segments 847 and 429) Both segments of force main will be excavated and exposed to allow for nondestructive testing (NDT) to be performed by Owner’s Subconsultant After NDT, the following work will be completed: Pipe Segment 429 Repair 24-inch ductile iron force main with a pipe repair clamp. Removal and replacement of approximately 20 feet of 24-inch diameter ductile iron force main utilizing dual line stop and bypass construction techniques. Pipe Segment 847 Repair 30-inch ductile iron force main with a pipe repair clamp |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |