Similar Projects
Hauling Of Limestone, Gravel, And Cinders From Various Plants
Infrastructure
Bidding

Snow and Ice Removal Miami Valley
Post-Bid
Dayton, OH 45402

Material Disposal
Term Contract
Post-Bid

EWP Debris Removal
Term Contract
Results
$100,000 to $250,000 est. value
Brookville, OH

Integrated Solid Waste Management
Term Contract
Results

Trash Removal
Term Contract
Post-Bid
Dayton, OH

Bulk Pebble Lime Hauling
Post-Bid
Dayton, OH

Asphalt Concrete, Bituminous Mixes, Equipment Rental and Material Hauling
Term Contract
Post-Bid

Solid Waste Collection and Disposal
Post-Bid
Huber Heights, OH 45424

Waste/Recycling Disposal and Transportation Services
Post-Bid
Dayton, OH 45417

Trash Hauling and Recycling Services
Post-Bid
Clayton, Dayton, Miamisburg, Moraine, New Lebanon, West Carrollton, OH 45422

Litter Pick-Up
Infrastructure
Post-Bid

Brine Application and Emergency Snow Removal Services
Infrastructure
Post-Bid
Dayton, OH

Scrap Metal Removal Services
Infrastructure
Post-Bid
OH

S205--Solid Waste and Recycling Services
Term Contract
Post-Bid
Cincinnati, OH

Last Updated 04/11/2022 11:37 AM
Project Title

EWP Debris Removal

Physical Address View project details and contacts
City, State (County) Brookville, OH   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of the clearing and removal of trees, snags, logs, brush, shrubs, stumps, and rubbish from and adjacent to Wolf Creek. 1855 linear ft. of channel clearing, debris removal, restoration of disturbed areas, and temporary site access improvements. Trees and other woody vegetation designated to remain undisturbed shall be protected from damage throughout the entire construction period. Clearing and removal of cleared materials shall be performed in a manner to minimize disturbance to standing trees/woody vegetation to remain, and land surface adjacent to cleared materials to be removed.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents