Similar Projects
Blower Building 090 Blower - 23R04 - North Shore Water Reclamation District
Alteration
Conception
$1,409,400 est. value
Gurnee, IL

UV System Upgrade - Construction - 23R23 - North Shore Water Reclamation District
Alteration
Conception
$3,147,200 est. value
Gurnee, IL

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Asphalt Sealcoating and Repairs at Raw Water Pump Station, Elevated Tank and Booster Pump Station Facilities
Infrastructure
Design
$200,000 CJ est. value
Lake Bluff, IL 60044

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Engineering - Phase III Construction Engineering Services for the Telegraph Road Improvement Project
Infrastructure
Bidding
$622,000 CJ est. value
Bannockburn, IL 60015

Blumberg Park
Renovation
Post-Bid
Less than $2,000,000 est. value
Deerfield, IL 60015

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Waveland Avenue Water Main and Storm Sewer Improvements
Results
$400,000 est. value
Gurnee, IL

Water and Sewer Interconnect Phase 1
Results
Fox Lake, IL

The Clove
New Construction, Infrastructure - 113,000 SF
Construction
$150,000,000 CJ est. value
Buffalo Grove, IL 60089

Midwest Industrial - Village of Libertyville
Addition, Build-Out - 480,580 SF
Pending Verification
Libertyville, IL 60048

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
$5,368,000 CJ est. value
Gurnee, IL 60031

St. James Fitness and Recreation Development
Demolition, New Construction, Infrastructure - 435,488 SF
Design
$75,000,000 CJ est. value
Lincolnshire, IL 60069

Last Updated 12/13/2022 03:17 PM
Project Title

Sheridan Elementary School Playground Work 2022

Physical Address View project details and contacts
City, State (County) Lake Forest, IL 60045   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $148,050 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the project work consists of the following prime contract: a.Playground and Drainage Improvements at Sheridan Elementary School. b.Refer to Section 01 10 00 - Summary for a description of the work included in the project. c. Project includes Allowances; see Section 01 21 00 Allowances for more information. Type of Contract: Single Lump Sum Contract, AIA Document A105. Bid Form: Bids must be submitted on forms provided by the Architect. Documents will be delivered electronically in PDF format. The contractor shall be required to comply with all provisions of the acts of the General Assembly of the State of Illinois related to Wage Rates, Discrimination, Sexual Harassment, Alcohol Use and Preference to Illinois Workmen. 8. Additional information and bidder requirements are included in the Instructions to Bidders and the Bid Documents. 9. Bid Stipulations: a.The successful bidder will be required to furnish a satisfactory Performance Bond and a Labor and Material Payment Bond for the full amount of the bid accepted. b.The Owner reserves the right to accept or reject any or all bids to waive any informalities in any bidding. c. No proposals shall be withdrawn for a period of sixty (60) days after the submittal of proposals. d.Bid Security is required in the amount of ten (10) percent of Proposal, made payable unconditionally to the Owner. Security shall be either certified check, cashier's check or bid bond issued by surety licensed to conduct business in the State of Illinois. 11.Last day for Addendums shall be 5:00 PM on Wednesday, October 26, 2022. 12.Last day for contractor questions shall be 5:00 PM on Monday, October 24, 2022. John Jewell, Project Architect Perkins + Will The Wrigley Building 410 N. Michigan Avenue Suite 1600 Chicago, IL 60611

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents