Similar Projects
CID 05 - 2020 Ground Storage Tanks - E
Post-Bid
$724,000 est. value
Elmendorf, TX 78112

CID 04 - 2020 Composite Elevated Storage Tank - D
Post-Bid
$1,065,000 est. value
Elmendorf, TX 78112

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

NACO Ground Storage Tank Rehabilitation Project
Results
Less than $1,884,210 est. value
San Antonio, TX 78233

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Grass Hill Elevated Storage Tank Painting and Rehabilitation
Results
$326,000 est. value
Leon Valley, TX 78238

Peppermint Elevated Storage Tank Rehabilitation
Post-Bid
Less than $486,000 est. value
Kirby, TX 78219

Construction of Wastewater Treatment Plant Driveway, Effluent Line to Discharge Point and Recycle Waterline Offset
Results
San Antonio, TX

2020 Water Production Storage Tank Facilities Project
Post-Bid
San Antonio, TX 78212

Northeast Service Center Underground Storage Tank Permanent Removal Project
Results
$148,100 est. value
San Antonio, TX 78233

Construct Elevated Storage Tank with Alternant Bid, Replace Booster Station and Ground Storage Tank at the Michael Unit
Post-Bid
San Antonio, TX 78200

West Avenue Elevated Storage Tank Painting and Rehabilitation Project
Results
Less than $2,588,700 est. value
San Antonio, TX 78212

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Grass Hill Elevated Storage Tank Painting and Rehabilitation
Results
Less than $350,000 est. value
Leon Valley, TX 78238

Preventive Maintenance, Repair and Tank Cleaning of Asphalt Storage Tanks
Term Contract
Post-Bid

Reported 09/03/2020 12:00 AM
Project Title

Rain Harvesting Installation

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78215   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Contractor to secure and install a rain harvesting system on its Education Outreach Center, currently being built at the Morgan’s Wonderland Camp. 2. This rain harvesting system will be used as a source of water for a garden and land management practice demonstration area located next to the Center. 3. The Contractor will work with the Camp General Contractor to ensure that the proper and appropriate gutters, downspouts and conduits are installed on the building. 4. The EAA is targeting the installation of a 20,000-gallon tank for main capacity, as well as a 1,000-gallon tank for demonstration purposes.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents