Similar Projects
2022-2024 Lead Water Service Line Replacement
Term Contract
Bidding
River Rouge, MI

Bid Package No. 7 Miscellaneous Improvements at Various Schools
Infrastructure, Alteration
Bidding
Lincoln Park, MI 48146

Annex Building Water Main and Fire Supression
Post-Bid
Detroit, MI

Water Meter Installation
Term Contract
Post-Bid
Detroit, MI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

As Needed Water Main Break Repairs
Term Contract
Results
Plymouth, MI 48170

Lead Service Line Replacement
Alteration
Bidding
Grosse Pointe Park, MI

Water Meter Replacement Program
Infrastructure
Post-Bid
Ecorse, MI

Implementation of the Advanced Metering Infrastructure (AMI) Program
Results
Belleville, MI 48111

Cold Water Single Register Mech Type 2 Inch Meters
Infrastructure
Post-Bid
Detroit, MI

Replacement Services of Lead Water Lead Lines-DPW
Results
Riverview, MI 48193

2022-2023 Lead Water Service Line Replacement Program
Term Contract
Post-Bid
Hamtramck, MI

2020 Tap and water Repair Contract
Results
Ecorse, MI 48229

2022 Water Main And Sewer Repairs
Alteration
Post-Bid
Ecorse, MI

Water Main Replacement and Asphalt Street Resurfacing, Phase 1 - 2021
Results
Dearborn, MI

Last Updated 04/05/2022 04:11 PM
Project Title

Lake Shore Road Water Main Replacement

Physical Address View project details and contacts
City, State (County) Grosse Pointe, MI   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the replacement of an existing 8” water main with a new 12” water main utilizing pipe bursting along Lake Shore Road from just south of Woodland Shore Drive to just north of Fairlake Lane. Water Main, 12”, HDPE, DR11, Pipe Burst.............................................................................Approx. 14,000 Lft Hydrant Assembly, Complete ..........................................................................................................Approx. 34 Ea Gate Valve and Well, __”.................................................................................................................Approx. 40 Ea HMA ............................................................................................................................................Approx. 600 Ton Conc Pavement, 6 inch, Nonreinf..............................................................................................Approx. 1,700 Syd Curb & Gutter, Conc, Det E1 .....................................................................................................Approx. 2,200 Lft Sidewalk, Conc, 4 inch (Incl. Class II Subbase).........................................................................Approx. 6,200 Sf

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents