Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Resurface
Infrastructure
Design
$300,000 CJ est. value
Tahlequah, OK 74464

Intersection Modification - US-62
Infrastructure
Bidding
$4,000,000 CJ est. value
Tahlequah, OK 74464

New Hospital - Cherokee Nation
New Construction, Infrastructure
Bidding
$400,000,000 CJ est. value
Tahlequah, OK 74464

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Wildwood Waterline Installation
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Hulbert, OK 74441

Utilities - SH 82
Infrastructure
Design
$1,000,000 CJ est. value
Tahlequah, OK 74464

Driveway for Meat Processing Plant
Infrastructure
Bidding
$200,000 CJ est. value
Tahlequah, OK 74464

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Mud Valley Road Water Line Relocation
Infrastructure
Bidding
$200,000 CJ est. value
Tahlequah, OK 74464

Mud Valley Road Natural Gas Line Relocation
Term Contract
Post-Bid
$90,000 CJ est. value
Tahlequah, OK 74464

Cherokee County Rural Water District No. 11 Mud Valley Road WL
Infrastructure
Bidding
$800,000 CJ est. value
Hulbert, OK 74441

4th Street Parking Lot Sealcoat and Re-Stripe
Infrastructure
Post-Bid
$300,000 CJ est. value
Tahlequah, OK 74464

Last Updated 08/30/2022 05:02 AM
Project Title

Utilities - SH 82

Physical Address View project details and contacts
City, State (County) Tahlequah, OK 74464   (Cherokee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $1,840,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-82: From 2.57 Mi S of Sh-82c Jct., North 6 Miles Ut for 30575(04) As of August 30, 2022, the project is in Design status. Anticipated letting month/year is November, 2023. Length : 5.990 Mi. OKDOT - Utilities - SH 82 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents