Similar Projects
Hopewell Senior Living
New Construction, Infrastructure
Conception
$24,000,000 CJ est. value
East Fishkill, NY 12533

Market Street Connect - 20-09 - City of Poughkeepsie
Infrastructure
Conception
$2,700,000 CJ est. value
Poughkeepsie, NY 12601

Beacon Commons
New Construction, Infrastructure - 20,428 SF
Design
$20,000,000 CJ est. value
Beacon, NY 12508

Store Space Self Storage
New Construction, Infrastructure - 41,257 SF
Design
$4,400,000 CJ est. value
Poughkeepsie, NY 12601

Dutchess County Veterans Cemetery Project
Infrastructure
Bidding
$500,000 CJ est. value
Wappingers Falls, NY 12590

40' x 60' x 16'4" Post Frame Storage Building and related electrical work
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Poughkeepsie, NY 12601

Boardman Road Library Wastewater Line Rerouting and Site Work
Infrastructure
Post-Bid
Poughkeepsie, NY 12603

Splash Pad at Wilcox Park
Infrastructure
Post-Bid
$400,000 CJ est. value
Stanfordville, NY 12581

Fallkill Dam Rehabilitation Project
Renovation
Results
$1,000,000 to $1,300,000 est. value
Poughkeepsie, NY 12601

Highway Department Excavation, Foundation / Footing, Piers and Slab Construction For A New Engineered Steel Building Garage
Infrastructure
Results
$78,750 CJ est. value
Fishkill, NY 12524

Wappingers C.S.D. - 2022 District Wide Renovations - Phase 4 - Site Work - S.1
Term Contract, Infrastructure
Construction
$900,000 CJ est. value
Hopewell Junction, NY 12533

Vassar Institute for the Liberal Arts
Demolition, New Construction, Infrastructure
Construction
$18,800,000 CJ est. value
Poughkeepsie, NY 12601

819 Main Street Mixed-Use Development
New Construction, Infrastructure - 10,634 SF
Pending Verification
$4,100,000 CJ est. value
Poughkeepsie, NY 12601

Main Street Multifamily Residential
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Poughkeepsie, NY 12601

Grand Avenue Street Improvements (Hooker Avenue - College Avenue) - 20-32 - City of Poughkeepsie
Infrastructure
Conception
$1,900,000 CJ est. value
Poughkeepsie, NY 12603

Last Updated 01/23/2023 12:32 AM
Project Title

Morgan Lake Dam - 20-21 - City of Poughkeepsie

Physical Address View project details and contacts
City, State (County) Poughkeepsie, NY 12601   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project calls for an evaluation and construction of the dam spillway. Consultant is evaluating the hydraulic capacity of the existing spillway and will produce conceptual plans to ultimately construct an auxiliary spillway. Spillway must be capable of passing the probable maximum flood capacity. PO 2018-275 for $12,100 was opened, and $10,600 expensed in 2018. Per NY State Dept of Environmental Conservation (NYSDEC) inadequate spillway capacity (identified in 2015 Engineering Assessment) is a serious deficiency and must be corrected. Alternate spillway designs were proposed in 2018 and need to be evaluated. Preferred alternate design and construction documents (Plans, Specs and Engineer's Estimate) need to be prepared. Design began in 2020 and will continue in 2022, with, if funding is acquired, construction commencing in 2023.. As January 23, 2023, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents