Similar Projects
Plant 83
New Construction, Demolition - 100,000 SF
Conception
$20,000,000 est. value
Baltimore, MD 21211

Camden Street Skywalk Removal
Demolition, Alteration
Conception
Less than $3,508,000 est. value
Baltimore, MD 21201

Madison Park North Redevelopment
New Construction
Design
$120,000,000 est. value
Baltimore, MD 21217

Stadium Square Block II
New Construction - 380,000 SF
Design
$275,000,000 est. value
Baltimore, MD 21230

ADA Improvements to James D. Gross Recreation Center
Infrastructure
Bidding
$350,000 CJ est. value
Baltimore, MD 21215

ADA Improvements to James D. Gross Recreation Center
Infrastructure
Bidding
$350,000 CJ est. value
Baltimore, MD 21215

Weinberg Place
New Construction, Renovation
Post-Bid
Baltimore, MD 21215

Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value

Baltimore Street Garage Restoration
Results
$500,000 to $1,000,000 est. value
Baltimore, MD 21202

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Harbor East Residential Tower
New Construction
Construction
$100,000,000 est. value
Baltimore, MD 21202

Roland Park Place Phase II
New Construction
Construction
$60,000,000 est. value
Baltimore, MD 21200

The Canton Overlook
New Construction
Pending Verification
Baltimore, MD 21224

Conkling Street Building Renovation
Renovation
Pending Verification
Baltimore, MD 21224

25th Street/Huntingdon Avenue Rehabilitation - Greenmount Avenue to 29th Street - 508-141 - City of Baltimore
Infrastructure
Conception
$18,518,000 est. value
Baltimore, MD 21218

Last Updated 07/29/2022 12:31 PM
Project Title

Boston Street Apartment Complex

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21224   (Baltimore City County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Civil Engineer To Subcontract, Bids by Invitation
Project Status Construction start expected May 2020
Bids Due View project details and contacts
Estimated Value $45,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 31, 2020, this project is on hold for undisclosed reasons. The project consists of 3 levels of parking with 5 levels of apartments above. The garage structure will be poured concrete and the apartment structure will be structural metal studs with precast plank. Please refer to the Instruction to Bidders in the General Documents folder for details on the bidding process. Please note that MEP drawings & specs are not available at this time & will be issued on or about Friday October 27th, 2017 as part of Addendum #1. Trades included on the project include but are not limited to: earthwork, utilities, paving, site concrete, pavers, fencing, landscaping, concrete, precast, masonry, structural steel, structural metal studs, misc metals, finish carpentry, waterproofing, insulation, weather barriers, wood soffit, roofing, green roof, caulking, doors, frames & hardware, coiling doors, glass & aluminum, aluminum windows, louvers, drywall, tile, flooring, painting, signage, specialties, appliances, casework, site furnishings, elevators, chutes, fire sprinkler, plumbing, HVAC & electrical. A building permit was issued in April 2017. A general contractor has been selected. Construction is anticipated to begin in spring 2018. Please contact: David Huott 410.453.6688 dhuott@rkinsley.com Div 3 & 4, 31, 32, & 33 (sitework) Kevin McKim 410.453.6799 kmckim@rkinsley.com Div 5, 6 & 7 Ken Smith 410.453.6699 ksmith@rkinsley.com Div 8, 9, 10, 11 & 12 Nick Kontos 410.453.4136 nkontos@rkinsley.com Div 14, 21, 22, 23 & 26 Kinsley Conditions: Prior to submitting your proposal, please review our Subcontractors Terms & Conditions, Tobacco & E-Cigarette Policy, and Contractor Safety Management Policy, which are posted in the General Documents folder on our SmartBid website. Our new Prequalification Application is also posted in the General Documents folder. By submitting a bid to Kinsley, your company agrees to abide by our Subcontract Terms & Conditions without modifications. Please note: In order for your company to be awarded a subcontract, a Prequalification Application must be completed and submitted with all supporting documentation. Thank You.

Details

3 Stories Above Grade, Parking Space/Stalls, 240 Parking Spaces. 8 Stories Above Grade, Apartments, 241 Unit(s).
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents