Similar Projects
Bridge Replacement - Oak Street - City of Dover
Demolition, New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Rollinsford, NH 03869

Water Main Replacement - Littleworth Road - City of Dover
Infrastructure
Conception
$3,600,000 CJ est. value
Dover, NH 03820

Cocheco Mixed-use Development
New Construction, Infrastructure - 25,000 SF
Design
$200,000,000 CJ est. value
Dover, NH 03820

74 Main Street Mixed Use Building
Demolition, New Construction, Infrastructure - 31,000 SF
Design
$4,000,000 CJ est. value
Durham, NH 03824

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Community Development Block Grant (CDBG) Housing Project - Water System Improvements
Infrastructure
Post-Bid
$1,300,000 est. value
Madbury, NH 03823

UNH Field House West Lot Parking Lot Site Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Durham, NH 03824

Water Sewer Inventory
Infrastructure
Results
Rochester, NH

Water System Project - Contract No. 1 - New Distribution System - Pineland Park
Infrastructure
Results
$600,000 to $700,000 est. value
Milton, NH 03851

Fownes Mill Condominiums
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Rochester, NH 03867

Champlin Place
New Construction, Infrastructure - 25,000 SF
Construction
$7,000,000 CJ est. value
Rochester, NH 03867

McCrone Place
New Construction, Infrastructure - 23,000 SF
Pending Verification
$25,000,000 CJ est. value
Dover, NH 03820

47 Chestnut Street Redevelopment
New Construction, Infrastructure - 2,500 SF
Pending Verification
$73,000,000 CJ est. value
Dover, NH 03820

Street Reconstruction - Oak/Ham/Ela - City of Dover
Infrastructure
Conception
$2,000,000 CJ est. value
Dover, NH 03820

Central Avenue Apartments
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Dover, NH 03820

Last Updated 03/18/2023 07:06 AM
Project Title

Edgewood Road Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Durham, NH 03824   (Strafford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $69,697 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. Location: The Work locations include, but are not limited to, locations within the following streets in the Town of Durham, New Hampshire. 1. Edgewood Road 2. The work area abuts and is within the University of New Hampshire campus. B. Work Included: The Work includes, but is not limited to, the following: 1. Sewer System Rehabilitation: a. Lining gravity sanitary sewer pipes. b. Lining, grouting and other rehabilitation of sewer manholes. c. Refer to the Manhole Rehabilitation Schedule and Sewer Pipe Rehabilitation Schedule for additional information. d. Existing flow management/bypass pumping for rehabilitation of sanitary sewer pipes and manholes. 2. Testing of sanitary sewers and manholes for proper rehabilitation and performance. 3. Television inspection of lined sewer pipes. 4. Other miscellaneous work shown in the Specifications for a complete and operational system. C. Removals, Relocations and Rearrangements 1. Examine the existing site for the work of all trades which will influence the cost of the work under the bid. This work shall include removals, relocations and rearrangements which may interfere with, disturb or complicate the performance of the work under the general bid involving systems, equipment and related service lines, which shall continue to be utilized as part of the finished project. The Contractor is responsible for all coordination in this regard. 2. Provide in the bid a sufficient amount to include all removals, relocations, rearrangements and reconnections herein specified, necessary or required to provide approved operation and coordination of the combined new and existing systems and equipment. 3. Provide in the bid a sufficient amount to include all temporary facilities required to maintain flows during the construction period, including bypass pumping, temporary piping, etc. The cost shall include the cost for all labor, tools, equipment and materials necessary.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents