Similar Projects
Last Updated | 03/18/2023 07:06 AM |
Project Title | Edgewood Road Sewer Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Durham, NH 03824 (Strafford County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $69,697 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. Location: The Work locations include, but are not limited to, locations within the following streets in the Town of Durham, New Hampshire. 1. Edgewood Road 2. The work area abuts and is within the University of New Hampshire campus. B. Work Included: The Work includes, but is not limited to, the following: 1. Sewer System Rehabilitation: a. Lining gravity sanitary sewer pipes. b. Lining, grouting and other rehabilitation of sewer manholes. c. Refer to the Manhole Rehabilitation Schedule and Sewer Pipe Rehabilitation Schedule for additional information. d. Existing flow management/bypass pumping for rehabilitation of sanitary sewer pipes and manholes. 2. Testing of sanitary sewers and manholes for proper rehabilitation and performance. 3. Television inspection of lined sewer pipes. 4. Other miscellaneous work shown in the Specifications for a complete and operational system. C. Removals, Relocations and Rearrangements 1. Examine the existing site for the work of all trades which will influence the cost of the work under the bid. This work shall include removals, relocations and rearrangements which may interfere with, disturb or complicate the performance of the work under the general bid involving systems, equipment and related service lines, which shall continue to be utilized as part of the finished project. The Contractor is responsible for all coordination in this regard. 2. Provide in the bid a sufficient amount to include all removals, relocations, rearrangements and reconnections herein specified, necessary or required to provide approved operation and coordination of the combined new and existing systems and equipment. 3. Provide in the bid a sufficient amount to include all temporary facilities required to maintain flows during the construction period, including bypass pumping, temporary piping, etc. The cost shall include the cost for all labor, tools, equipment and materials necessary. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |