Similar Projects
Bridge Replacement
New Construction
Bidding
KY

Bridge Replacement
New Construction
Bidding
KY

Bridge Replacement - Miller Road (CR1500) (C00062)
New Construction, Demolition - 720 SF
Post-Bid
Elizabethtown, KY 42701

Meshack Bridge Replacement
Post-Bid
Tompkinsville, KY

East Alexandria Pike 63
Results
KY

Bridge Replacement
Results
KY

Bridge Replacement
New Construction
Bidding
KY

Two Abutments
New Construction
Post-Bid
Harlan, KY

Bridge Over Ohio River. Bridge Substructure Rehab
Results
KY

Grade, Drain and Surface With Bridge
New Construction
Bidding

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Pedestrian Bridge Replacement
Renovation
Results
Louisville, KY 40209

Bridge Deck Restoration and Waterproofing
New Construction
Bidding

Bridge Repairs
Results
KY

Bridge Deck Restoration and Waterproofing
New Construction
Bidding

Last Updated 04/23/2021 03:07 AM
Project Title

Jimmy Hall Bridge HP AML Reclamation

Physical Address View project details and contacts
City, State (County) Frankfort, KY   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $56,325
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Jimmy Hall Bridge HP AML Reclamation Project consists of removal and replacement of the bridge to the Hall residence of Jimmy Hall near the community of Van, KY. The project site is located at Latitude: 37°07'56" N, Longitude: 82° 53' 52"W. To reach the site from the KY AML Branch Office at 101 Bulldog Lane, Hazard, KY turn right onto KY 15 south and travel 25.4 mile to the intersection of KY 160, turn right onto KY 160, travel 2.1 mile to house on left of road and below the road elevation across the stream. (Site Area) A low water crossing from the Barbara Ison Slide HP PH2 AML Reclamation Project washed out and debris became lodged beneath the bridge and contributed to the damage of the structure. It is proposed to remove the bridge and abutments and construct a permanent crossing with a portable timber bridge. Sediment control will be provided by installation of silt fence or bales as directed. The material from the existing abutments will be excavated to provide stable approach and any excess will be place at the previously used waste area for the Barbara Ison project. No trees greater than 3"diameter will be removed during this phase of reclamation. (Waste Area) The majority of material (approximately 50 yds) will be placed on site at designated Waste Area on the Barbara Ison Slide HP PH2 AML Reclamation Project.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents