Similar Projects
Y--Florida Ditch and Canal Lining
Design
$1,000,000 to $5,000,000 est. value
Durango, CO

Design Services for Cherry Creek Reservoir Shoreline Stabilization ESS and Tl PRFS
Bidding
CO

US 160 in Pagosa Springs
Bidding
$5,000,000 to $20,000,000 est. value
CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

2019 Bayfield Culvert Repair
Results
$200,000 to $300,000 est. value
Bayfield, CO 81122

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Crossroads Overlot Grading
Bidding
Greenwood Village, CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

112th and Irma Drive Drainage Improvements
Bidding
Northglenn, CO 80233

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Las Vegas Street Culvert at Colony Hills Channel
Results
Less than $1,000,000 est. value
Colorado Springs, CO 80903

Culvert Pipe
Bidding
CO

Detention Pond Improvements
Post-Bid
Golden, CO

Last Updated 04/28/2021 10:24 AM
Project Title

NW and SW Aquatic Habitat Design-Build Projects

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking an experienced and qualified firm for design build engineering and construction services for six (6) habitat projects listed below: 1) Eagle River Diversion Maintenance and Habitat Improvements at Gypsum Ponds SWA 2) North Platte River Restoration at Verner SWA 3) Yampa River Restoration at Sarvis Creek SWA 4) Bank Stabilization at Upper Chuck Lewis SWA 5) Gunnison River Bank Stabilization at Gunnison River SWA 6) East River Habitat Improvements at Roaring Judy State Fish Hatchery

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Pier Construction.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings.
Division 09 - Finishes.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 28 - Electronic Safety and Security, Access Control, Security Access Detection.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents