Similar Projects
Wastewater Force Main and Pump Station Improvements
New Construction, Infrastructure
Results
$1,200,000 est. value
AR

Fairwood and Molly Creek Pump Station Improvements
New Construction
Results
Hot Springs, AR

Jefferson Street Pump Station Improvements
Results
Fulton, AR

Wastewater Treatment Facility Pump Station Improvements and Birch Street Pump Station Improvements
Renovation
Bidding
Trumann, AR

Purcell Road Lift Station
New Construction
Post-Bid
$2,500,000 est. value
Paragould, AR

Wastewater Pump Station Flood Damage Repairs and Mitigation Project Fourth Phase (PS-28 North 6th Street and PS-29 South 98th Circle No. 19-29-C4)
Renovation
Post-Bid
Fort Smith, AR

Field Pump Station Improvements
New Construction
Results
Redfield, AR

Wastewater System Improvements - Contract Section II (Wastewater Treatment Facility)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Construction of Five (5) Sewer Pump Stations
Renovation
Post-Bid
Dumas, AR

Blanchard Springs Caverns VIC Lift Station
Renovation
Results
Fifty-Six, AR 72533

Wastewater Lift Station #3 Rehabilitation
Renovation
Post-Bid
Oak Grove Heights, AR

Jamison and Arch Street Pump Station Modifications
New Construction
Post-Bid
Little Rock, AR 72209

Pump Station Building Rehabilitation
Renovation
Results
Hot Springs, AR

Pump Station 3 and Pump Station 4 Rehabilitation and Common Force Main
Renovation
Post-Bid
West Memphis, AR

Birdtown Pump Station Upgrade
Addition, Alteration
Post-Bid
$400,000 est. value
Springfield, AR 72157

Reported 10/29/2021 12:00 AM
Project Title

Bridgeway Pump Station Gravity Conversion

Physical Address View project details and contacts
City, State (County) North Little Rock, AR   (Pulaski County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $425,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project consists of installing ~2,367 linear feet of 8” PVC SDR 26 or better, install seven (7) standard 4’ diameter manholes and one (1) doghouse style 6’ diameter manhole.

Details

Lift and Pump Stations, New Construction, Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents