Similar Projects
North Kealy Avenue Mixed-Use Development
New Construction - 17,600 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lewisville, TX

Upland Properties Office Building
New Construction - 5,998 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Justin, TX 76247

CMAR Lewisville Public Safety Complex
New Construction - 116,000 SF
Bidding
$65,000,000 est. value
Lewisville, TX 75077

New Johnie R Daniel and Hatfield Elementary Replacement
New Construction
Bidding
$61,000,000 est. value
Fort Worth, Northlake, TX

The Puttery
Renovation - 30,085 SF
Post-Bid
The Colony, TX 75056

The Trade Group Offices & Warehouse
Renovation
Post-Bid
Carrollton, TX 75007

Aura Old Town Apartments
New Construction
Construction
Lewisville, TX 75057

Lakeside Center
New Construction - 138,000 SF
Construction
$10,000,000 CJ est. value
Flower Mound, TX 75077

Lakeside Crossing
New Construction - 31,183 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Lewisville, TX 75077

Bison Grove Industrial Park
New Construction - 900,000 SF
Design
$34,000,000 est. value
Lewisville, TX 75067

Lakeside Mixed-Use Office Building
New Construction
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Flower Mound, TX

Tealstone Offices
New Construction - 25,385 SF
Construction
$3,000,000 est. value
Denton, TX 76208

Long Prairie Road Offices
Build-Out - 4,600 SF
Design
$400,000 est. value
Flower Mound, TX 75022

Y1da--Parking Garage Structural (Va-21-00053364)
Renovation
Post-Bid
$25,000 to $100,000 est. value
San Antonio, TX 78229

Creekview 121 Offices
New Construction - 137,000 SF
Construction
$10,000,000 CJ est. value
Lewisville, TX 75056

Last Updated 03/01/2022 11:13 AM
Project Title

Charles Schwab Corporate Campus Phase II

Physical Address View project details and contacts
City, State (County) Westlake, TX 76092   (Denton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Parking Garage
Contracting Method
Project Status Construction Commenced March 2019, Construction Complete as of second quarter 2021
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, New Construction, Parking Garage, New Construction, 617,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents